振动压路机外文翻译(编辑修改稿)内容摘要:
nt frame with rubber vibration blocks. V. vibrationwheeldrive motor and reducer vibrationwheeldrive motor, reducer and stand together in front on the frame, gear box output connection on the clubs Board, powered by the motor output shaft to the gear, and then to the plum blossom, plum blossom again to vibrating wheel, driving vibration wheel rotation. VI. vibration support both ends of the eccentric shaft, walking through the vibration of the bearing on the bearing in the housing, vibration motors by supporting ponents supported on the right bearing seat. Vibration bearing Sweden SKF bearing or Germany FAG bearing. Walking support assemblies for maintenancefree structure. The sixth section Steering system Steering system steering with articulated steering, mainly from the steering gear pump, hydraulic steering gear, two steering cylinders, pressure tubing and other ponents. Hydraulic steering system installed on the rear frame, through the Steering cylinder telescopic control of vehicle steering. The seventh section Braking system Braking system in order to ensure the safety of roller working and traveling, YZ18C braking systems equipped with braking, parking brake and emergency brake three. I. driving brake brake with hydraulic brake. Hydraulic brake controlled by moving the joystick to achieve. Joystick control of control valves back into position, motor driven pump supplying driving traffic to zero, the rollers stop. II. parking brake and emergency brake when the roller is traveling or working, rear axle and front drive reducer valve control normally closed on multiple pieces of brake is on, without braking effect. When the roller is stopped, several pieces of brake friction locking through a spring force, in a State of braking. Emergency braking is mainly hydraulic servo brake, supported by a mechanical brake. After the emergency brake buttons is pressed, driving pumps swashplate immediately return to zero and hydraulic brake。 Meanwhile, gearbox and rear axle brakes also promptly produce precursor braking effect. Note: in State of emergency shall not be used for emergency braking, especially in the fastrunning state. The eight section Frame Center of the frame after the frame including the former frame, articulated frame in three parts. Connecting them into a hinged support the upper structure of the machine as a whole. I. in front of the frame by the scraper before box after box before the Assembly, Board, boards, two side panels and other ponents. Its main functions are supporting vibrating wheel assembly. For the first frame structure of a typical boxes, bination of high strength steel plate, with sufficient strength and rigidity to resist strong impact force and torque of roller working. Scraper to scrape adhesion under the soil on the drum. Scraper frontend and vibrating wheel clearance of cylindrical surface can be adjusted. II. after frame after frame fuel tank, protection against roll frame, hydraulic tanks, hydraulic tank supports, panels, frames and other ponents. Its main function is to support the engine and the cab, fixed rear axle. After the frame of the structure of a rectangular box, front and Center articulated frame in vertical shaft and attached to the front plate, followed by the Assembly of the fuel tank, the middle is grooved steel frame. In order to ensure strength, weak parts of strengthening ribs to strengthen, and trough steel plate with seal sealed into a box girder structure. Rear axle at the bottom plate with bolts and rear axle Assembly of rigid connection. To reduce the effects of vibration, between the engine and rear frame with elastic damping blocks, and you can easily adjust the engine to a horizontal position. III. Centre pinned by articulated frame Center articulated frame, shaft end bezel, ball bearings and other ponents. Through it before and after the frame articulated into a whole, can swing around implementation steering and front frame. Through the extension of control to the fuel tank to control the steering angle. Machine frame allow horizontal relative swing between before and after, not more than 177。 15 176。 swing angle, this roller can be stable on uneven pavement and paction work. In order to facilitate maintenance, spherical bearing lubrication radial spherical plain bearing. The nine section Cab and control systems Cab and cab full sealing damping control system structure, installing airconditioning, fortable operation reliable, stylish magnificent。振动压路机外文翻译(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。