挡土墙的外文翻译(编辑修改稿)内容摘要:

phisticated cultures to reinforce mud bricks and mud walls. Nevertheless, in spite of this long usage, French architect H. Vidal was able to obtain a patent (ca. mid1960s) on the general configuration of , which he termed “reinforced earth”. We see three basic ponents in this figure. ① the earth fill—usually select granular material with less than 15 percent passing sieve. ② reinforcement—strips or rods of metal, strips or sheets of geotextiles, wire grids, or chain link fencing or geogrids (grids made from plastic) fastened to the facing unit and extending into the backfill some distance. Vidal used only metal strips. ③ facing unit—not necessary but usually used to maintain appearance and to avoid soil erosion between the reinforcements. These three ponents are bined to form a wall whose side view is shown in . When wire mesh or other reinforcement with discontinuities (grid voids) is used, apportion may be bent , similar to the sheet of , to form a facing unit. Gridtype reinforcements strengthen the soil through a bination of friction and passive pressure pullout resistance. The bentup portio。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。