德马格positioningmeasuringsystem_en(编辑修改稿)内容摘要:
, smaller reflective tape normally suffices. To avoid highly reflective surfaces (e. g. shelves or other surfaces) to mirror in light beams or scattered light, align the reflector in the „free space“ : mount with approx. 3176。 slant (X or Y direction). 3 o Slide 5 DCC Cranes amp。 Components dep. 1205 Prein Positioning measuring system DME 5000 Arrangement of Measuring Sensors The distance of neighboring distance measuring sensors must be at least amin = 100 mm to prevent mutual interference. Depending on the range s, this distance a must equal amin + x smax. A minimum beam distance of 100 mm should be maintained for the data transmission photoelectric switches of the DDLS series, independent of the maximum range smax. DDLS DDLS DME DME DME reflector reflector reflector Slide 6 DCC Cranes amp。 Components dep. 1205 Prein Positioning measuring system The operating panel is divided into two areas: • LC Display: Displays the menu。德马格positioningmeasuringsystem_en(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。