德马格中仓行车培训讲义dedriveprofrequencyinvertersforcranedrives(编辑修改稿)内容摘要:

duty factor either cannot be specified or the specified duty factor can be exceeded in individual cases. If the cyclic duty factor is known (regenerative operation ? motor operation / break), an overloadresistant braking resistor can be selected when dimensioning the resistor. Slide 19 DCC Cranes amp。 Components dep. 1205 Prein Dedrive Pro Sizes and currents Rated current for continuous duty without switching operation / acceleration Rated current for continuous duty with switching operation / acceleration up to 150 % overload (travel and lifting as before) Relevant for specification! Onceoff overload (. test load) No operating current! Relevant for specification! Onceoff overload No operating current! Slide 21 DCC Cranes amp。 Components dep. 1205 Prein Dedrive Pro Sizes and currents 380 ... 415 V Apparent output code Slide 22 DCC Cranes amp。 Components dep. 1205 Prein  Special functions:  SOSP, SOST (4stage)  Parameter set switchover between two applications including motor data  Intelligent brake logic: Brake release contact evaluation  Direct joystick connection and programmable joystick characteristics  Master/follower (torque or speed follower)  Electronic gearbox (master/slave) Speed/position control via pulse encoder  Higher speeds at partial load  Conical rotor motor operation  Load spectrum calculation Dedrive Pro Product features Slide 23 DCC Cranes amp。 Components dep. 1205 Prein Functions Standard inputs/outputs • 10V reference output。 max. 10mA • +10V reference output。 max. 10mA • 3 analogue inputs 1 voltage input 0...10V, 2 current inputs 0...20mA • auxiliary voltage output。 +24 V, max. 100mA • 2 analogue outputs 0...20mA, • 6 + 1 digital inputs 24 V • 3 relay outputs Slide 24 DCC Cranes amp。 Components dep. 1205 Prein Dedrive Pro Module options: Extension modules  RAIO01 analogue I/O extension module  2 inputs  2 outputs  RDIO01 digital I/O extension module  3 inputs  2 relay outputs  RTAC01 pulse generator evaluation Slide 25 DCC Cranes amp。 Components dep. 1205 Prein Dedrive Pro Module options: Communication modules  Profibus DP  CDP 312R operating terminal  Fibre optic cable module  Networking  Parameters programmed via PC (also requires PCMCIA card) Slide 26 DCC Cranes amp。 Components dep. 1205 Prein Dedrive Pro Module options: Profibus DP long travel master ( X1 ) long travel slave ( X1 ) cross travel ( Y ) Hoist ( Z ) RPBA 01 adress : 10 ACS 800010025 ACS 800010025 ACS 800010016 ACS 800010120 DP S7 CPU 317 RPBA 01 adress : 20 RPBA 01 adress : 30 RPBA 01 adress : 40 Slide 27 DCC Cranes amp。 Components dep. 1205 Prein Dedrive Pro Module options: pulse generator evaluation RTAC01 long travel master ( X1 ) long travel slave ( X1 ) cross travel ( Y ) Hoist。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。