计算机组成原理题库(编辑修改稿)内容摘要:
eed. 问题 11 The mercial 4bit ALU chip 74181 can only perform 16 different arithmetic operations. 问题 12 4bit Arithmetic Logic Unit 74181 can perform ( ). A. 16 possible logic operations B. 16 different arithmetic operations C. 4bit multiplication/division operations D. 16 different arithmetic operations or 16 possible logic operations 问题 13 ALU belongs to ( ). A. calculator unit B. control unit C. memory D. register 问题 14 Using four 74181ALU chips and one 74182CLA chip can achieve the following carry propagation circuit: ( ). A. carry lookahead of all 16 bits B. ripple carry inside each 4bit group and carry lookahead across different groups C. ripplecarry circuit D. carry lookahead inside each 4bit group and ripple carry across different groups 第六章 问题 1 Exponent unit in floating point calculator can realize addition, subtraction, multiplication and division operations. 问题 2 In addition/subtraction operation on two floating point numbers, x= Mx2Ex and y= My2Ey, it requires exponent equalization before arithmetic operation. If ExEy, shift__My___。 if ExEy, shift_Mx____。 if Ex=Ey, no shift. 问题 3 The mantissa of floating point number uses 2‟s plement representation, the binary code of the mantissa before normalization is . It needs _left_ normalization, and it should shift_1_bit. 问题 4 ( ) representation is used in mantissa of floating point number. A. biased code or excess2q code B. sign magnitude C. 2‟s plement D. 1‟s plement 问题 5 In the representation of floating point numbers, ( ) is implicit(隐含 ) B. the radix of the number system to represent the mantissa C. mantissa D. sign bit 问题 6 For a IEEE 754 standard FloatingPoint number, its mantissa uses ( ) representation. A. biased code or excess2q code B. 1‟s plement C. sign magnitude D. 2‟s plement 问题 7 Which of the followings is correct: A. Exponent unit can realize addition, subtraction, multiplication and division operations. B. Mantissa unit only realize multiplication and subtraction operations. C. Exponent unit only realize addition and subtraction for exponent. D. Floating point calculator can be implemented by exponent and mantissa units. 问题 8 The maximal positive number in IEEE754 standard for 32bits format is () A. +( 2 – 223) 2+255 B. +( 2 – 223) 2+127 C. +( 1 – 223) 2+127 D. 2+127 + 227 问题 9 Exponent unit in floating point calculator can realize operations of addition, subtraction and pare. 问题 10 Which is normalized FloatingPoint number, if its mantissa is represented by 2‟s plement format? A. B. C. D. 问题 11 In IEEE 754 standard, a floating point number is posed of sign bit s, exponent e, and mantissa m. 问题 12 The sign bit „1‟ of a biased code number represents the number for__非负数 _, while „0‟ represents the number for__负数 ___. 问题 13 In IEEE754 standard floating point, mantissa is coded as__原码 __, exponent is coded as_移码 . 问题 14 In IEEE 754 standard, the value of exponent is represented in excess128 code. 问题 15 In a algorithm for normalized floatpoint number, a number is 25 , with 2‟s plement representation for mantissa. Then it ( ). A. needs left shift 2 bits of mantissa for normalized B. needs left shift 1 bit of mantissa for normalized. C. needs no normalized right normalized 问题 16 The exponent, E, of a floating point number usually uses biased code representation, which is more convenient for paring size or exponent equalization. 问题 17 The mantissa of a FloatingPoint number is represented by 2‟s plement, then whether the FloatingPoint number is normalized is decided by ( ). A. mantissa‟s sign bit and the first bit of mantissa‟s numerical part are identical B. the sign bit of exponent and mantissa are identical C. mantissa‟s sign bit and the first bit of mantissa‟s numerical part are different D. the sign bit of exponent and mantissa are different 问题 18 In the representation of floating point numbers, ___基数 ___ is implicit and invisible to the puter hardware. 问题 19 The purpose of using normalized floating point number is ( ). A. to expand the range of data representation avoid for overflow C. convenient for floating point operation D. to ensure maximum accuracy of representation 问题 20 ( ) representation is used in exponent of FloatingPoint number. A. biased code or excess2q code B. 1‟s plement C. sign magnitude D. 2‟s plement 第七章 问题 1 Indirect addressing mode is designed to facilitate the access of data arrays. 问题 2 Instruction set is a key factor to represent the performance of a puter. 问题 3 RegisterRegister (RR) addressing mode is slower than RegisterStorage (RS) addressing mode. 问题 4 The function of program control instructions is ( ) . A. to perform arithmetic and logic operations B. to move data between I/O and CPU C. to move data between memory and CPU D. to change the program executing order 问题 5。计算机组成原理题库(编辑修改稿)
相关推荐
值之差,称为( )。 A、随机误差; B、测量误差; C、系统误差; D、平均误差 2检定证书、检定结果通知书必须字迹清楚;数据无误 ,有( )人员签字,并加盖检定单位印章。 A、检定人员 B、检定人员和核验人员 C、检定、核验、主管人员 D、检定人员 和主管人员 22 进口计量器具必须经( )检定合格后,方可销售。 A、省级以上人民政府计量行政部门;B、县级以上人民政府 计量行政部门;C
阀门传动单 编号: NO: 阀门编号 阀门名称 传动时间 传动结果 传动评价 传动人 试转记录卡 机组号: 设备及系统名称:
的申报工作。 力德风电公司通过市场、技术和资本运作的有效整合,取得了高性能稀土永磁材料的稳定供应渠道,拥有目前世界上先进的稀土永磁磁 钢生产基地。 新余市拟上市目标企业情况 新余市委关于制定全市国民经济和社会发展第十二个五年规划中提到, 鼓励和引导企业加强科学管理,建立现代企业制度,注重企业品牌战略和文化建设,引导资源和技术向优强企业、优势产品、优秀企业家集中,大力实施 “ 十百千亿 ” 工程
3025 设备清扫后检查表 设备清扫后检查表 方法 重 点 是 否 备 注 用眼睛看 (1)压力表位置是否很容易点检 (2)压力表的正常值是否很容易判读 (3)油量计位置是否适当 (4)油面窗是否很干净 (6)油量是否在正常范围 (6)油的颜色是否正常 (7)给油口的盖子是否锁紧了 (8)油槽各部位有没有可让灰尘跑进去的空隙 (9)给油口盖子的通气孔是否阻塞 (10)V形皮带装置是否数量正确
面的界面看到,下方已经有了例送信息 量贩版使用设置说明 B、芝华士买二送一活动。 在例送操作界面,主商品选择 2瓶芝华士,赠送商品选择 1瓶芝华士,然后保存。 量贩版使用设置说明 此时再回到前面的界面,可以看到已达到了效果: 量贩版使用设置说明 C、芝华士套餐,包含一瓶芝华士、 5瓶绿茶,但是又不能影响芝华士的单独销售,且单卖芝华士和芝华士套餐的价格是不同的:
公平对待。 3.本制度适用注明奖罚条款的其他各项规章制度。 第二条 奖励制度 1.对员工的奖励实行以精神鼓励与物质奖励相结合的办法。 2.公司设立如下奖励方法:书面表扬;嘉奖;小功;大功;年终评奖。 3.奖励规定: ( 1) 对于以下表现之一的职工,应当给予书面表扬; a) 一贯忠于职守,积极负责,廉洁奉公,工作突出的; b) 积极维护公司荣誉,在客户中树立良 好公司形象和口啤; c)