开关磁阻电机的前景中外文翻译(编辑修改稿)内容摘要:

n 1983 the United Kingdom (SRD Ltd.) First introduced the SRD Series products, the product named OULTON. TASCdriven system in 1984 also launched their products. In addition SRD Ltd. Developed a tram driver for the system to run in 1986 has 500km. The emergence of electric drive in the sector caused the reaction. In many performance indicators reached an unexpected high level of performance throughout the system meet or exceed the price indices of industrial longterm a number of widely used variablespeed drive system. 9039。 s from the last century of the International Conference on the SRD system, look at the article on the SRD system has its advantages from the demonstration, development and application of theory to the design stage, optimizing the design of a research stage. On the SR motor, controller, power converter, such as theory of operation, and optimize the design, structure and other aspects of the form of more indepth research. Second, the principle of the superiority of a briefing and briefing Switched reluctance motor drive system (SRD) is a more plex integration of mechanical and electrical devices, SRD operational needs of online realtime feedback on the volume of a general rotor position, speed and current, etc., and then under the control objectives are given control of the information integrated mand, to achieve operational control and protection functions. Rotor position detection is the SRD an important ponent of the rotor position detected signal is the right of the main switching device to switch to the logic of the basis for speed control provides a link speed feedback signal. Switched Reluctance Motor has a regeneration capacity, systems and high efficiency. Switched Reluctance Motor for the theoretical study and pr。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。