建设项目管理中英文外文翻译(编辑修改稿)内容摘要:
project construction and even in the construction industry as a whole is pale, the maximum value is obtained in the earlier process: from one system to another, in the schedule have hardly any effect, and the amount of redesign and redraw is minimized. However, in the early stages of design, to produce any saving document is one of the most difficult, because there are usually no formal drawings or plan. The most recognizable effects occur in the schematic diagram of the final and the design and development stage of early. There is enough information on the idea of rational judgment system. Of course, most of these savings can be achieved. In construction drawing, macroscopical idea is already in place, and most of the ideas embodied in the file details. During the construction process, value engineering efforts continue. Because making changes to the project, design development should follow in the design phase to assess changes in the procedure. Contractors can also in the field of application of value engineering principle, save money method, equipment or sequence of operations. Who achieve these fields generated by saving depends on the form of contract. Some value engineering operation is informal, though the team members in favor of the arrangements and procedures, the others follow a more formal by another person established standards, the following is a good value engineering project is the main ponent of: (1) Review the field identification. He could be performed separately, as each team member critically reviews the design drawings and specifications. The idea was conceived, concern in the design field in this period of time, can use the new product or process, material the use of different strengths, simplify the system, or to processing details. (2) Brain storm team members sitting together with idea list and tossing ideas let others to accept, the idea is to get as many ideas as possible on the desktop. As discussed in the context of members should be thought from the others and many have special ideas inspired. (3) Each of the proposed analysis. The Group determines the standards to evaluate each idea. Discussion of alternatives in the brainstorming sessions with standard test. Here the brainstorming session, costs are usually not considered first. Once a proposal in the functional requirements based on the merits, and then calculate the cost, involves a considerable amount of time and energy. It is a keeping brainstorming focus on functional oute and reduce costs. (4) Report to management. The team will be all the idea of putting it all together. When presented with more and more information is available, some may be in other phases of the project carried out a detailed analysis. Some have been t。建设项目管理中英文外文翻译(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。