工程热力学的历史外文翻译(编辑修改稿)内容摘要:

ng Thermodynamics include chemical reactions such as bustion processes, such as dissolving the physical absorption or desorption chemical processes, which also involves the aspects of chemical thermodynamics of basic knowledge. Engineering Thermodynamics is on the macrotheory of thermal phenomena, the study is a macro, it has been summarized by numerous facts of the first law of thermodynamics, and the second law of thermodynamics third law of thermodynamics as a basis for reasoning by the material pressure, temperature , specific volume and other macro parameters and heating, cooling, expansion, contraction, such as the overall behavior of the macrophenomena and to study the thermal process. In this way, the internal structure and material to the specific nature, as a macrophysical properties of real data to be sure, do not need to microstructure of the material to make any assumptions, so analysis of the results of reasoning with a high degree of reliability, and coherent . This is its unique advantages. Ancient man long ago learned to make fire and use of fire, but then pay attention to explore the hot, cold real phenomenon. However, until the end of the 17th century, people still can not correctly distinguish between temperature and heat of these two basic concepts of nature. Popular at that time, said Heat and Mass Transfer under the rule, people mistakenly believe that the high temperature object is stored as a result of thermal mass number. 1709 ~ Fahrenheit temperature scale in 1714 and 1742 ~ 1745 Celsius temperature to establish the subject to move the temperature with accepted standards. Followed by calorimetry technology developed for Earth o。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。