国贸理论与政策hestandardtrademodel(编辑修改稿)内容摘要:

quilibrium in isolation • The basis for and the gains from trade with increasing costs • Trade based on differences in tastes 2020/9/15 Equilibrium in isolation autarky PA = PX/PY = 1/4 PA’ = PX/PY= 4 imply what? 2020/9/15 Ch6. The Standard Trade Model • PPF with increasing costs • Community indifference curves • Equilibrium in isolation • The basis for and the gains from trade with increasing costs • Trade based on differences in tastes 2020/9/15 The Gains from Trade with Increasing Costs 60X 60Y ∆BCE: Trade。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。