外文资料翻译---锂电池充电器的设计(编辑修改稿)内容摘要:
mage, even exploding. The safety of the battery refreshes the fast charge machine( namely battery can at small be filled with the electricity in 3 hours, is usually a hour) demand of the to the unit electric voltage, refresh the electric current and the battery temperatures to carry on to measure by the square, avoid at the time of being filled with the electricity because of leading to in of the method SLA battery and lithium batteries refreshes the method to settle the electric voltage method to want to limit to flow for the ever。 The battery of NiCd and battery of NiMHs refresh the the electric current method for the ever , and have severals to stop the judgment method for refresh differently. Biggest refresh the electric current biggest refresh the electric current to have relation with battery capacity( C).Biggest usually refresh the electric current to mean with the number of the battery example, The capacity of the battery for 750 mAhs, refresh the electric current as 750 mAs, then refresh the electric current as 1 C(1 times battery capacity).If The electric current to flow refresh is a C/40, then refreshing the electric current for the battery capacity in addition to with the hot battery refresh is the process that the electric power delivers the by chemical reaction conservancy e is not electric powers all convert for the sake of the chemistry in the battery electric power conversions became the thermal energy, having the function of the heating to the pond be filled with, if continue to refresh, then all electric powers conversion is the thermal energy of the fast charge this will make the quickly, if the hour of can not pare with stop refresh and then will result in battery , while design the battery charger, to the is count for much that carry on the supervision bine to stop refresh in time. The discretion method battery stopped refresh of different and applied situation and work environment limitted to the choice of the method that the judgment stop sometimes temperature allow of easily, but can measure electric voltage, or is other text takes the electric voltage variety rate( dV/ dt) as the basic judgment to stop The method for refresh, but with the temperature and absolute electric voltage be worth for assistance and the hardware support that this text describe speaks as method of the havings of say. Time of t – this method that is the decision when stop refresh most in used for spare project of the hour of fast also be .Refresh(14 16 Hour) basic project of the applicable to various refresh when the electric voltage of V – be the electric voltage to outrun the upper with the forever settle the electric current refreshes the match biggest electric current is decide by the battery, usually For the 1 prevent176。 froming refresh the electric current leads to causes battery lead greatly hot, the restrict of the electric current at this time very method Is a lithium battery basic to refresh and stop project. The actual lithium battery charger usually still continues into after attain biggest electric voltage Go the second stage refresh, to attain 100% battery capacity. For battery of NiCd and battery of NiMHs are originally method can Be the spare judgmen。外文资料翻译---锂电池充电器的设计(编辑修改稿)
相关推荐
responsible behavior. However, these reverse logistics strategies might lead to a large amount o f returned and recycled merchandise. Businesses require additional information to resolve this vicious
the cycle following the one in which the transition was detected. Since two machine cycles (24 oscillator periods) are required to recognize a 1to0 transition, the maximum count rate is 1/24 of the
ject connected to it. So if you want to hold a word or sentence, you create a String reference: But here you‟ve created only the reference, not an object. If you decided to send a message to s at
agnitudes of the analog input ,if x si the analog input,the digital output is given by y=Q(x ) Where Q is the quantizing function. The function x(t) is a discretetime operation of digital control
方法,其中的参数方程都必须不断地更新,确定最合适的一个确定最合适的步长(即,计算时间间隔)保持程序运行时间是合理的模拟 PWM 方案。 三. 实验评价 为了建立信心,在仿真技术,他们被应用到一个合适无刷直流电机 驱动器。 1. 实验机 图 .2 是一个横断面示意图是电动机 为实验驱动器。 这种电动机采用钕合金磁钢在一个配置专门用来诱使电压一个梯形波形在单层未分配相绕组。 实测波形的感应电压相 a
阳齿轮设计中轮缘厚 度和齿根半径的形状的影响,采用包含齿轮接触、滚动轴承、运营商、销售商和轴系的集成有限元素分析( FEA)方法。 由于两个齿轮表面通常存在一个接触点,所以当进行齿轮分析时,传统的有限元分析就会出现问题。 而本次研究,使用了三维多体接触分析程序的齿轮系统的详细有限元分析方法。 具体分析模型如下图 3所示,它是一个独特的刚度模型,使用有效的联系解决算法,并且结合了有限元素和接触理论