仁爱九年级英语上册unit_1_topic_2_section_c(编辑修改稿)内容摘要:
use of the large population, the traffic is much heavier. • What’s the topic sentence of paragraph three? • What has China done to control the population。 Onechild policy. So far, our government has taken many measures to control the population. • Say something about China’s onechild policy. • What is the author’s attitude towards the population problem。 Onechild policy has worked well in controlling China’s population. Watch and read (视频 p131a) more Topic: the disadvantages of China’s large population poor living condition low average per capita ine not enough food environment problem not well developed can’t offer the children good education The population is increasing by 80 million every year. And it is growing faster and faster. Listen to 2a and fill in the blanks Every minute, about 261 babies are born in the world. That means people have to f。仁爱九年级英语上册unit_1_topic_2_section_c(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。