外文翻译-基于c8051单片机的双相信号发生器软件设计-单片机(编辑修改稿)内容摘要:
circuit to generate sine vibration, to obtain the necessary frequency. But can also Synthesis technology to obtain the necessary 9 rate. Frequency of use of technology into the signal generator, often referred to as synthetic signal generator. 3 The implementation methods of signal generator The realization of the function signal generator method usually have the following kinds: (1) the ponents with division: it is usually function generator single function generator and frequency is not high, its work is not very stable, not easy debugging. (2) can be made by the transistor, the opamp IC etc, more universal device is made with special function signal generator IC produce. Early function signal generator IC, such as L8038, BA205, XR2207/2209 etc, the functions of them less, precision, frequency cap 300kHz, unable to produce only higher frequency of signal, adjust the way also not enough flexibility, frequency and occupies emptiespared to cannot independent regulation, both affecting each other. (3) use monolithic integrated chip function generator: can produce various waveform, achieve the high frequency, and easy to debug. In view of this, the American beauty developed a new generation letter ICMAX038 function signal generator, it overes the (2) chip shortings, can achieve higher technical index, is the chip deficits. MAX038 frequency and high accuracy, good, therefore it is called a highfrequency precision function signal generator IC. In PLL, vco, frequency synthesizer, pulse width omdulatros etc circuit design, selection of devices are MAX038. Author: , Nationality: British Source: : / / / download / file2020 1 关于传统信号发生器的简介 (译文 1)摘要 在 21 世纪的今天,信号发生器获得了广泛的应用和快速的发展信号发生器作为电子技术领域中最基本的电子仪器,广泛应用于航空航天测控、通信系统、电子对抗、电子测量、科研等各个领域中。 它能 满足测试系统的多种要求,成为了系统综合测试中不可缺少的组成部分。 而且,随着科技进步,信号发生器作为普遍的实验信号源,在当今的电子实验设计中起到了举足轻重的作用。 1 简介 信号发生器是一种最悠久的测量仪器,早在 20 年代电子设备刚出现时它就产生了。 随着通信和雷达技术的发展, 40年代出现了主要用于测试各种接收机的标准信号发生器,使信号发生器 从定性分析的测试仪器发展成定量分析的测量仪器。 同时还出现了可用 测量脉冲电路或用作脉冲调制器的脉冲信号发生器。 由于早期的信号发生器机械结构比较复杂,功率比较大,电路比较简单,因 此发展速度比较慢。 直到 1964 年才出现第一台全晶体管的信号发生器。 自 60 年代以来信号发生器有了迅速的发展,出现了函数发生器,这个时期的信号发生器多采用模拟电子技术,由分立元件。外文翻译-基于c8051单片机的双相信号发生器软件设计-单片机(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。