外文翻译--高层建筑设计与城市空间-建筑结构(编辑修改稿)内容摘要:

hould be considered as a whole. For a city highrise buildings often have a certain symbolic representation and can reflect the level of an urban economy and level of development, choose a reasonable model is particularly important. Highrise building structure because of its limitations and the use of functional requirements, often in the shape of the structure to follow in the form of construction, but not too many changes, some highrise buildings and even exposed directly to the structure without modification. The main part of highrise building is its tower, the tower forms the shape of the highrise buildings plays a decisive role, the current number of foreign and domestic highrise buildings have a unique shape and a clear identification of, for a city with a certain degree of representation, it can be said that the existence of highrise building is one of the reasons why. With the shortage of resources in recent years the emergence of a global sustainable development, environmental protection and energysaving highrise building on the side is very wasteful, with the attendant on the emergence of the ecological construction of concepts such as ecoarchitect Norman • Fosterdesigned headquarters building in Frankfurt mercial banks in the symbolic meaning and function of stressed at the same time, the concept of ecofood, is a world39。 s first ecotype super highrise building. Triangular plane of its construction, like holding a clover plants petals: petals part office space, some plants for hollow hall. Hollow hall from the role of natural ventilation, but also for the construction to create a rich internal landscape. And climate designers Yeang Menara Kuala Lumpur, Malaysia design reflects the use of the building is airconnected open space inside and outside the building, implementation of the bioclimatic building thinking, the introduction of a large number of plants, spiral facade greening, and at the bottom of the vertical slope Green will help regulate the climate, as much as possible to narrow the gap between man and nature, good indoor and outdoor space to plete。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。