外文翻译--频率范围(编辑修改稿)内容摘要:
between and MHz is located approximately in the middle of the CB radio range. In addition to inductive radio systems (RFID), ISM applications operating in this frequency range include diathermic apparatus (medical application), high frequency welding equipment (industrial application), remote controlled models and installing 27 MHz RFID systems for industrial applications, particular attention should be given to any high frequency welding equipment that may be located in the vicinity. HF welding equipment generates high field strengths, which may interfere with the operation of RFID systems operating at the same frequency in the planning 27 MHz RFID systems for hospitals (. access systems), consideration should be given to any diathermic apparatus that may be present. 5 Frequency range MHz The range – MHz is located at the lower end of the VHF propagation of waves is limited to the ground wave, so damping due to buildings and other obstacles is less marked. The frequency ranges adjoining this ISM range are occupied by mobile mercial radio systems (forestry, motorway management) and by television broadcasting (VHF range I). The main ISM applications that are operated in this range are telemetry (transmission of measuring data) and remote control applications. The author knows of no RFID systems operating in this range, which can be attributed to the unsuitability of this frequency range for this type of system. The ranges that can be achieved with inductive coupling in this range are significantly lower than those that can be achieved at all the lower frequency ranges that are available, whereas the wavelengths of m in this range are unsuitable for the construction of small and cheap backscatter transponders. 6 Frequency range MHz The frequency range – MHz is allocated to amateur radio services worldwide. Radio amateurs use this range for voice and data transmission and for munication via relay radio stations or homebuilt space satellites. The propagation of waves in this UHF frequency range is approximately strong damping and reflection of ining electromagic waves occurs when buildings and other obstacles are encountered. Depending upon the operating method and transmission power, systems used by radio amateurs achieve distances between30 and 300 km. Worldwide connections are also possible using space satellites. The ISM range – MHz is located approximately in the middle of the amateur radio band and is extremely heavily occupied by a wide range of ISM applications. In addition to backscatter (RFID) systems, baby inters, telemetry ransmitters(including those for domestic applications, . wireless external thermometers), cordless headphones, unregistered LPD walkietalkies for short range radio, keyless entry systems (handheld transmitters for vehicle central locking) and many other applications are crammed into this frequency r。外文翻译--频率范围(编辑修改稿)
相关推荐
h,去皮程度则由以下的公式计算。 物料去皮容量%= 100干燥后的马铃薯样品 干燥后的皮屑 这台机器专门因这次实验而制造,五个马铃薯样品分别被称量,而且每个都做了标志。 分别向每个马铃薯样品扎孔,然后注入不同的颜色将其染色。 它们均放入去皮鼓中加工。 为了达到实验目的,一已知重量(5,10,15,20千克)的马铃薯同时被放入去皮鼓中。 喷水管入口被接在一个水开关上,去皮鼓以30 — 40
hould be considered as a whole. For a city highrise buildings often have a certain symbolic representation and can reflect the level of an urban economy and level of development, choose a reasonable
收率实验确保在 鲤鱼肉里分别 1 mg kg1,5 mg kg1 和 10 mg kg1。 同时,制备空白样品。 之间的运行和内部运行 CV 值的重复性参数精密的检测方法是确定的。 三种鱼肉样品进行分析时确保每个设防水平之间的运行 CV值在 1 mg kg1, 5 mg kg1 和 10 mg kg1。 三个平 行的肌肉样品都注射 5 mg kg1 来确定运行的 CV 值。
第六篇 新版员工离职通知书 员工离职通知书服务单位 职称 姓名到职日期 年 月 日离职日期 年 月 日 全提资离 职 原 因自 动 被 动体弱多病 服 兵 役 开 除 解 雇另有他就 试用不合辞退 其 他物 品 交 还 或 应 扣 款单位 应办事项 已收还或应扣金额 应办事项 已收还或应扣金额 接收人或经 管 人服务单位 移交清楚未了事目已交待清楚服 装 伙 食福利借款
h customer in the sample, a variable of DUR is used to indicate the time that customer churn occurred, or for censored cases, the last time at which customers were observed, both measured from the
s. A mix of different properties, as well as economic, as well as their choice of Shenzhen Company, the mine DMC3000 series Motion Control Card. Motion Control of the system is based on the PCI bus