外文翻译--车辆检测技术在交通管理上的应用-交通线路(编辑修改稿)内容摘要:
n zones (suitable for multiple lane coverage) that are incorporated into the more expensive detector. Table 3 shows examples of overhead detector technology patibility with several traffic management applications. The assumptions shown concerning the application dictate, in part, the appropriateness of the technology. THEORY OF OVERHEAD DETECTOR OPERATION The following paragraphs give a brief explanation of the underlying operating principles for microwave, passive infrared, active infrared, ultrasonic, passive acoustic, and video image processor detectors. Microwave Radar Microwave radars used in the . for vehicle detection transmit energy at GHz, a frequency allocated by the FCC for this purpose. Their output power is regulated by the FCC and certified by the manufacturer to meet FCC requirements. No further certification is required of the transportation agencies for their deployment. Two types of microwave radar detectors are used in traffic management applications. The first transmits electromagic energy at a constant frequency. It measures the speed of vehicles within its field of view using the Doppler principle, where the difference in frequency between the transmitted and received signals is proportional to the vehicle speed. Thus, the detection of a frequency shift denotes the passage of a vehicle. This type of detector cannot detect stopped vehicles and is, therefore, not suitable for applications that require vehicle presence such as at a signal light or stop bar. The second type of microwave radar detector transmits a sawtooth waveform, also called a frequencymodulated continuous wave (FMCW), that varies the transmitted frequency continuously with time. It permits stationary vehicles to be detected by measuring the range from the detector to the vehicle and also calculates vehicle speed by measuring the time it takes for the vehicle to travel between two internal markers (range bins) that represent known distances from the radar. Vehicle speed is then simply calculated as the distance between the two range bins divided by the time it takes the vehicle to travel that distance. Since this detector can sense stopped vehicles, it is sometimes referred to as a truepresence microwave radar. Passive Infrared Detectors Passive infrared detectors can supply vehicle passage and presence data, but not speed. They use an energy sensitive photon detector located at the optical focal plane to measure the infrared energy emitted by objects in the detector’s field of view. Passive detectors do not transmit energy of their own. When a vehicle enters the detection zone, it produces a change in the energy normally measured from the road surface in the absence of a vehicle. The change in energy is proportional to the absolute temperature of the vehicle and the emissivity of the vehicle’s metal surface (emissivity is equal to the ratio of the energy actually emitted by a material to the energy emitted by a perfect radiator of energy at the same temperature). The difference in energy that reaches the detector is reduced when there is water vapor, rain, snow, or fog in the atmosphere. For the approximately 20 ft ( m) distances typical of traffic monitoring applications with this type of detector, these atmospheric constituents may n。外文翻译--车辆检测技术在交通管理上的应用-交通线路(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。