外文翻译--蒸汽发生器水位模糊控制研究(编辑修改稿)内容摘要:

ly, but there is an opposite process at first. This phenomenon is called false water level phenomenon. III. DESIGN OF WATER LEVEL FUZZY CONTROLLER The conventional PID controller has a poor control performance to the steam generator that exist“ false water level” characteristics, showing a greater overshoot in the tracking time. But a welldesigned fuzzy controller is able to overe the false water level phenomenon, and has good control performance. A. Sstructure of Fuzzy Controller The structure showed in Figure 1. Choose the water level error (e) and change rate of error (ec) as input of the fuzzy controller, the output of the fuzzy controller is the added value of the valve opening signal Δu. Meanwhile, use the steam flow feedforward to overe the false water level phenomenon, use water flow feedback to overe fluctuations in water supply side . k1, k2 were water flow and steam flow transmitter conversion factor. To ensure the water flow to match the steam flow, k1 and k2 values should be equal to. B. Fuzzy theory, fuzzy subset and Membership Function The fuzzy Analects of e, ec and u are [6, 6], both with seven fuzzy sets NB (negative big), NM (negative middle), NS (negative small), ZO (zero), PS (positive small), PM (positive middle) and PB (positive big) to describe. e, ec and, Δu are all using triangular membership function (see Figure 2) Figure 2. Input and output variable membership function C. Fuzzy control rule table The establishment principle of fuzzy control rules are: when the error is large, the output control volume should give priority to eliminate error as soon as possible。 when the error is small, the output control volume should givepriority to prevent overshoot. Where ec is negative ,it shows that water level has a rising trend, if the water level is high at this time, then we should reduce the valve opening signal。 whereas, we should open the valve more. Through a prehensive analysis of expertise, the establishment of rule table shown in Table 1. Table 1. Fuzzy control rule table D. F。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。