外文翻译--汽车悬架系统-汽车设计(编辑修改稿)内容摘要:
reading and feeling machine, with in advance the critical value that set up proceeds the parison putes, immediately certain at where full general how big of loading and adding to . The active in car a liquid presses with the air type: From the angle demarcation of the control dint, the of can is divided into passive of , active of in half with active of . Current, the automotive a system has the spring coil with reduce to flap the machine mostly, theincapable source inside a system insupplies the device, its flexibility can39。 t change with the exterior work with the , therefore calling that this kind of is passive of . Active an action for thering is direct dint in conduct and actions taking place machine, can according to input and output the superior feedback of proceeding control, making a the of has to reduce to shake the characteristic bestly, toing increase the automotive and going smoothly with manipulate the constitutes with a dint occurrence machine Fe from the flexibility a C. Half active a spring coil for can seeing making from variable characteristic with machine that reducing and flapping the a system constitutes, although it can39。 t proceed the superior control with regulate with the outsider importation, it can press saving under every kind of term of the calculator superior spring coil with reduce to flap the machine excellent to turn the parameter instruction to regulate the spring coil just a the appearance of for with reducing flapping from flexibility a C with a per coefficient can the machine of regulated within the scope of big constitute. The electronics technique control car a system is main from( the car is high and change direction the Cape, acceleration, road the estimate) spread to feel the machine, electronics control ECU, of control of carry out machine etc. control function of the system usually has below three: 1 the car is high to adjust to be the car at rise and fall When the uneven road drive, can make carriage jacked up, in order to in pass。 When the good road mades good time, can lower the carriage, to reduce the air help, increase to manipulate the stability. Dint controls is used to increase to manipulate the stability automotively, in the flashback curved, nasty accelerates to move with the urgent system circumstance next, can rr is to the side , horizontal put the flutter with the control of the carriage can more quick, precision, the car mades good time with the stability exaltation of the turn, carriage side ex in carriage is small when system move, starting with nasty accelerate can after reducing .Even in the bad road, the flutter of the carriage too less, the tire increases to the adhesive strength of the ground. active type liquid presses of The active type liquid that electronics control presses a quantity for can according to of with acceleration etc., making use of the liquid press the parts actively automotive vibration in active type liquid presses a the of arrange to is sepress the variety of the carriage. 3 spring coil just a control changes spring coil just degree, make a contented sport or fortable request. Adopt an empress, cahown as diagram on the car, having in the nearby gearing in center of gravity in car lengthways, horizontal acceleration with horizontal put the top preads to feel machine, use to collect the carriage the vibration, the car wheel jumps about, carriage。外文翻译--汽车悬架系统-汽车设计(编辑修改稿)
相关推荐
difficultieswhen use a CAD system to design productindependentparts and the whole assembly of an injection mould. First,there are usually around one hundred productindependent partsin a mould set,
in managerial positions, or overpay executives. As such, ownership concentration can either mitigate or exacerbate agency problems and consequently may affect the position and effectiveness of the
由于布局设计涉及到许多逻辑和步骤, 因此, 在型腔布局设计中,就需要对许多不同类别的知识加以描述和表征。 该知识依据如下所述的面向对象的概念可以分为五类: (1)设计实例 /案例:以往的设计案例和当前的设计实例。 (2)关系:父类的子类关系,类实例关系。 (3)属性:设计变量,特征,设计问题的属性。 (4)规则:一般设计规则,设计经验。 (5)程序和 /或模型:数值计算,数学模型,分析
, reduce rides personnel extent of the injuries. Fasten your seat belt airbags play our role is also an important condition. Because the airbag to maximize role for the ride in the impact of the
(Ug)的功耗比率(此区域功耗比率与 Ug无关)。 从图 2b看出 : 对于双 PDT沸腾系统来说,公式 (1)的预示的功耗比率 P/P0实际数据要小一点。 在图 2b中(仅供参考),沸腾系统现有的数据与公式 (1)用 于六叶圆盘涡轮式叶轮搅拌器沸腾系统的计算结果相比较,得出以下改进公式 Hassan Robinson(1977) 30
栅格分析已被广泛用于冲压车间的测量应力 分布当中,因此能够通过测绘成型极限图的有规则的应力来分析金属片的可冲压性。 圆栅格比其他类型的栅格例如方形栅格有主要的优势,因为它们没有任何的方向性,这种优势在于圆变形后会成为椭圆。 这两个主要的方向清晰地通过长轴与短轴展示出来。 通过在成型极限图上测量长轴与短轴的长度得出主张力的大小,就能够估计成形部分的区域。 在目前的研究中