外文翻译--模具型腔数控加工计算机辅助刀具选择和研究-模具设计(编辑修改稿)内容摘要:
esbased automated reasoning suitable razor blades materials. For example, if the final processing of materials for the steel, machine tool jig for good stability, cutlery cantilever structures for short, razor blades materials for WAP25. Rough machining cutlery portfolio optimization Xingqiang rough machining the aim is to maximize the removal of excess metal normally used milling cutter, takecutting approach. Thus, 3D mould Xingqiang the rough machining process, is actually a series of ponents Xingqiang processing. Cutlery optimization is to find a group of cutlery portfolio, allowing for maximum efficiency removal of most metals. Cutlery portfolio optimized basic methods as follows : A. To do some long step into knife in the direction of a group of vertical and horizontal search Xingqiang another entity to form a search layer. B. Derive closed to the contours. C. Calculated between Central and outside the island or islands and the distance between the key that affect cutlery choice geometric constraints algorithm flow As shown in figure 3 D. According to the principle of the merger (adjacent to the critical distance will be smaller than the difference between the threshold) to search layer merger, graphic processing and identifying viable cutlery sets, a processing layer. E. Determine the use of each processing layer cutlery, cutlery Xingqiang processing portfolio. F. According cutlery remended processing parameters (cutting speed, depth and into Xianxiao to speed), the calculation of material removal. G. According to the actual removal of the volume processing layer, the processing time for each processing layer. H. Xingqiang calculating the total processing time and residual volume. I. The overall portfolio of the Group cutlery processing efficiency assessment. J . Repeat a~i until derive optimal mix of cutlery. If time is the goal, called for the entire processing time t Xingqiang shortest portfolio to optimize cutlery. Semifinished cutlery choice The main purpose is to remove semifinished rough machining residual contours of the new warrants. To pletely remove height, depth must be greater than Xianxiao parts of each level to the surface distance x. Its algorithm steps are as follows : Step 1:entity models from parts of two adjacent to the cross section of the surface contours and the corresponding length。 Step 2: The average length of contours。 Step 3:calculate its width。 Step 4 : calculating height floor to the surface of parts to the law distance x。 Step 5 : steps 1~ repeat steps 4, each level of decision Xianxiao depth。 Step 6。外文翻译--模具型腔数控加工计算机辅助刀具选择和研究-模具设计(编辑修改稿)
相关推荐
y. All these have fully demonstrated the development of the State Council and state departments tooling industry attention and support. Mold around the world about the current annual output of 60
hing you see。 talking a look at employee performance appraisals, and talking to your customers. Renew the information you’ve gathered and try to determine in which area training may be the answer to
的随机性。 对于相同的颗粒,它们的运动不同于那些具有相同粉尘含量的粒子。 但是入口速度不同,或者粉尘含量不同;进口速度相同,最后的结果不同,一些被俘获,但是另一些从排气管中逃逸。 在本文中,分析理解所有云图的基本动态流畅的参数。 4 图 4 静压云 图粉尘含量 =1%,入口 速度达到 18m / s 图 5 粉尘含量 =1%,入口速度 =18m/s 的固体 沿 Y 轴的速度云图 从图 4
第十八篇 新版实习合约 实 习 合 约立合约人 工业股份有限公司(以下简称甲方)与 (以下简称乙方) ,由甲方招收乙方为 ,议订条款如下:乙方自愿遵照甲方规定细则实习技术,学徒期间与学徒期满后,愿遵守下列规定。 1·学徒期间两年,乙方如中途求去者,原返还甲方训练费用,膳宿费用及按月支支领之加用金。 2·学徒期满后乙方原在甲方继续服务两年,如违约不能履行本项规定时,原按还方两年来训练、膳宿
,并 被得到最优配置, 这不仅有助于保持合作创新网络的创新策略和它的技术路线之间的一致性,而且有助于合 作创新网络最优化分配研发资源,持续优化网络结构。 因此动态性对于保持网络的活力和持续的研发能力的一个重要的因素。 构建基于价值网的垂直合作创新网络 ( 2) 垂直合作创新网 络的运作机制 基于 Prabakar Kathandaramant and David T. Wilson’ s
ent of this endeavor is focused on the reduction of the tooling costs and the leadtime related to the stamping of auto body panels, even under increasing technological difficulties such as the use of