外文翻译--机械加工基础简介(编辑修改稿)内容摘要:

fit was obtained, the fitter therefore being a ‘fitter’ in the literal sense. It is obvious that the two parts would have to remain together, and in the event of one having to be replaced, the fitting would have to be done all over again. I n these days, we expect to be able to purchase a replacement for a broken part, and for it to function correctly without the need for scraping and other fitting operations. When one part can be used ‘off the shelf’ to replace another of the same dimension and material specification, the parts are said to be interchangeable. A system of interchangeability usually lowers the production costs as there is no need for an expensive, ‘fiddling’ operation, and it benefits the customer in the event of the need to replace worn parts. Limits and Tolerances Machine parts are manufactured so they are interchangeable. In other words, each part of a machine or mechanism is made to a certain size and shape so it will fit into any other machine or mechanism of the same type. To make the part interchangeable, each individual part must be made to a size that will fit the mating part in the correct way. It is not only impossible, but also impractical to make many parts to an exact size. This is because machines are not perfect, and the tools bee worn. A slight variation from the exact size is always allowed. The amount of this variation depends on the kind of part being manufactured. For example, a part might be made 6 in. long with a variation allowed of (three thousandths) in. above and below this size. Therefore, the part could be to in. and still be the correct size. These are known as the limits. The difference between upper and lower limits is called the tolerance. A tolerance is the total permissible variation in the size of a part. The basic size is that size from which limits of size are derived by the application of allowances and tolerances. Sometimes the limit is allowed in only one direction. This is known as unilateral tolerance. Unilateral tolerancing is a system of dimensioning where the tolerance (that is variation) is shown I only one direction from the nominal size. Unilateral tolerancing allow the changing of tolerance on a hole or shaft without seriously affecting the fit. When the tolerance is in both directions from the basic size, it is known as a bilateral tolerance (plus and minus). Bilateral tolerancing is a system of dimensioning where the tolerance (that is variation) is split and is shown on either s。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。