外文翻译--基于单片机的学习式倒计时器(编辑修改稿)内容摘要:
untdown, one kind is the news countdown, this kind of countdown in decides cyclical under the signal control pattern to use. What this system design is the study type countdown. This system has the following characteristic:① The design is the independent module, uses studies independently the type working, but adapts the streettraffic control lights time change automatically。 ②The work power source is from the streettraffic control lights, does not need another external connection power line, is advantageous for the installment。 ③ Has many kinds of display modes, the system has 99 s,40 s,20 s,10 the s countdown pattern to be possible to supply the choice. The system installation is flexible, the modulation, the structurization, the extension are good, the movement is safely stable, is highly effective. 2 system system design and the hardware circuit countdown system (may also use at89S series) including the STC10F04XE monolithic integrated circuit, the eliminator supply electric circuit, to examine the electric circuit, the watchdog electric circuit, the driving circuit, the LED display circuit and so on. power circuit this countdown takes the electricity from the signal light, the signal lamp voltage is directly 220 V, after 18 V transformer voltage droppings the rectification bridge has given 7805, for monolithic integrated circuit use. Because has red, yellow, the green 3 kind of signal lights, altogether has used 3 18 V transformers, from red, green, the yellow light takes the electricity separately. examine the electric circuit in the study type countdown electric circuit, must the realtime examination traffic light time. Uses the light pair examination in here. When has the signal input, the light pair TIL117 5 feet (C) outputs for the low level signal, examines the low level through the monolithic integrated。外文翻译--基于单片机的学习式倒计时器(编辑修改稿)
相关推荐
than one meter. In recent years, water meter is arranged on the indoor and caused many problems cause the attention of people increasingly: Home meter reading disturbs people 39。 s normal life and
策略改善系统性能 ,同时满足高精度和高速的要求。 标准的 PMAC 控制器提供了一种 PID 位置环伺服滤波器。 PID 和 NOTCH 伺服滤波器如图 2所示。 通常 ,这种滤波器是足够控制系统和容易理解的 ,即使对于非控制专家。 这个滤波器通过设置适当对于每个电动机适当的变量 I来调节。 适当的比例增益 (P Ix30)提供系统 的刚性。 微分增益 (D Ix31)提供了稳定的阻尼。
knowledge version. The properties of performance knowledge itself could be varied. It is one kind of the radical mode. And it is the important approach to improve functions and extend performance
enough and it should be further improved. In the future the packaging machinery has a growing tendency for the application of microputer and electromechanical integration. A plete mechatronics system
xample, in order to deliver a product, activities such as designing, assembly, and shipping are essential. Moreover, for these activities, the abovementioned resources are consumed. The ABC procedure
1.. NUM_ALOGOUT_CARD] OF ANALOG_16_DATA。 *) END_VAR 第 5 页 共 8 页 TASK T1 (INTERVAL := t50ms, PRIORITY :=3)。 TASK T2 (INTERVAL := t10ms, PRIORITY :=2)。 TASK T3 (INTERVAL := t500ms, PRIORITY :=4)。