石化赛科90万吨乙烯装置仪表施工技术方案(61页)-工程设计(编辑修改稿)内容摘要:

ument joint check secondly 20 1 20 1 20 13 随机仪表的安装调试、检测 installation, adjustment and examination of the sample instrument 20 10 20 1 30 14 分析仪表的安装调试 installation and adjustment of the analysis instruments 20 1 20 1 30 15 电仪之间的联锁确认 interlock affirm between electrity instruments 20 1 20 1 30 16 管道安装仪表和执行机构的检查确认 check and notarize the pipe installation instrument and executive instituation 20 10 20 1 30 17 仪表盘、柜基础槽钢安装 the installation of instrument plates ,desks and ground grooves 20 1 20 1 18 仪表盘、柜安装 the installation of instrument plates and desks 20 8 20 20 19 DCS、 SIS 的安装调试、检测 adjustment and examine of DCS、 SIS installation 20 21 20 9 20 配合工艺试车 assort process driving 20 1 20 1 20 fastgium of construction:  施工管理人员 construction management personnel 6 人 (persons)  仪表技术员 instrument technician 4 人 (persons)  仪表工 instrument workers 70 人 (persons)  电焊工 welder 10 人 (persons)  起重工 lifting worker 5 人 (persons)  维护电工 maitenance electrician 2 人 (person)  设备管理员 equipment controller 1 人 (person)  普通力工 mon labors 30 人 (persons) 五、 仪表设备、材料入库要求 the Requirements of Instrument Equipment and Material Housing ( 1)仪表设备入库验收要求 the acception requirements of housing instrument equipments 加强仪表设备在运输存放过程中的产品保护,注意防晒、防雨、防潮、防碰撞。 Enforce the product protection of instrument equipments when delivery,pay attention to prevent shining,raining,damping and colliding. 检查到货设备铭牌及型号、规格、材质、测量范围、使用电源等 技术条件是否符合设计要求。 Check if the lable,type,specification,materials,measurement scope,power , conditions of the arrived equipments are correspond to designing requirement. 设备外观应无损伤、无变形、无零件丢失,油漆脱落等现象,外形主要尺寸、工艺接口、电气接口、蒸汽伴热接口尺寸应符合设计要求。 The equipment appearance shall not been damaged,distorted,accessory lost,paint fell off,the main measurement,craft interfaces,electrity interfaces and steam hot interface should ply with the design requirements. 合格证、校验报告书、随机资料、随机带的特殊安装调校工具应齐全,并收起由专人妥善保管,对于没有合格证的仪表设备 及安装材料拒绝接收。 Certifications,check reports,sample datas,and the special installation and adjustment utensils should uniform and storage by person to receive the unqualified instrument equipments and installation materials. DCS/SIS 的机柜、操作台、仪表、 仪器等设备的开箱检验工作应在中国海关商检人员、 EP 承包商、采购部、监理承包商及施工承包商等人员到场的情况下共同开箱。 Opening and checking instruments and apparatus of DCS/SIS such as the machine desks,operation desks,instruments and apparatus of DCS/SIS should be done when China Custom checker,EP contractor,procurement department,supervision contractor and construction contractor have been to the location. 开箱检验工作中发现的遗漏、差错、缺损等情况,根据赛科要求应由采购部交 EP 承包商及时处理解决。 If the omit,error,short and damage be found when opening and checking, procurement department should hand it on EP contractor in time according to SECCO requirements. 说明书等随机资料至少必须提供一份复印件给施工 承包商。 At least a copy data such as directions should be handed on the construction contractor. 节流装置在安装应前将节流元件取出进行加工尺寸检查,并做好检查记录。 Throttle elements should be taken out and check their measurements before installing the equipment,note it carefully at the same time. ( 2)材料配件入库验收要求 the requirements of material fittings housing 检查材质、型号、数量、质量是否符合赛科、设计要求。 Check if the material,type,quality and quatity ply with the requirements of SECCO and designing. 检查是否有质保书,核对质保书批号与所供货材料批号是否一致,并将质保书收起由专人妥善保管。 Check the qualityensuring book and if the types are corresponding in qualityensuring book and materias provided,and safekeep the qualityensuring book by special person. 材料代用要赛科公司、设计或监理书面 认可。 Materials replacing should be accepted in writing by SECCO,designer and supervisor. 在仓库保管期间,各类材料应有明显型号标志,并应分类堆放。 In the course of storage,all kinds of materials shall be marked obviously and piled up according to species. ( 3)对验收不合格者一律不准入库,并应及时通知赛科、 EP 承 包商、监理,待其提供处理意见后方可处理,不得用于工程。 The unqualified shall not be housed. Inform SECCO,EP contractor, supervisor on time and shall not been dealed until they provided disposal shall not be used in project. 六、焊接施工规定 welding Construction Rules 仪表焊接施工前,电焊 作业人员必须提供相应钢种且在有效期内的焊工合格证书。 The welders must provide the corresponding steel kinds and the certification in valid. 焊工焊接作业之前必须清楚所焊工件的具体材料,按焊接责任工程师所编《 90 万吨 /年乙烯装置焊材选用表》选用焊丝、焊条。 The welders must know the concrete materials clearly before welding and choose welding rod and welding silk according to the Table of Selecting Welding Materials of 900KTY Ethylene Plant which be statemented by the charging engineer. 焊条及焊丝按乙烯项目部制定程序领取。 Welding rod and welding silk should be pulled down by the procedure made by the Ethylene Department. 点固焊与正式焊的焊接工艺,选用焊材应一致,焊接前必须将焊口内的油漆、铁锈、氧化物等清除干净。 The process of dot fixed welding and formal welding should select the same painting,rust,oxid in the welding jaws should be cleaned before welding. 阀门焊接时,阀门必须处于开启状态。 The valves must be open when welding. 耐热合金钢等特殊导压管焊接作业,应按焊接责任师下发的工艺卡施工。 The special guiding pressure pipe welding works such as bearing hot alloy steel should be constructed according to the process card sent by the welding charger. 为保证焊接质量,不锈钢导压管及伴热管焊接采用氩弧焊焊接工艺。 For ensuring the welding quality,stainless guiding pressure pipe and withhot pipe welding should adopt the argon arc welding process. 仪表立柱及现场支吊架必须满焊,及时清理焊渣及药皮。 The instrument standing poles and supports on field must be welded fully,the sediments and dug peel should be cleaned on time. 工艺设备及管道表面严禁焊接支架或进行引弧。 The welding supporting and guiding arc shall not be done on the surface of process equipments and pipes. 焊接完成后,应及时对焊口进行防腐处理。 When welding finished,the timely anticorrosion dealing on the welding jaws. 七、 仪表施工技术规定 Technical Stipulation for Instrument Co。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。