外文翻译--城市道路线位选择之要点(编辑修改稿)内容摘要:

ks According to the previous experience on engineering, the problem of removal and pensation is often an important factor influencing the project advancement. Therefore, we should pay attention to the road linebit as much as possible to avoid dense building areas and to reduce the cost of demolition and resettlementthe. When we have to demolish some buildings,we should try our best to carry on the country39。 s resettlement subsidy policy, and we need to not only safeguard the lawful rights and interests of the demolition parties, but also guarantee the smooth progress of construction projects. The Property Law of People39。 s Republic of China was put in practice on October 1, on, the demolition for urban road construction or land development should be considered more carefully. The consideration of economic interests of the parties In the process of selecting road line’s scheme, on the premise of standard meeting, if the alignment of road is bad, its investment is small。 if the alignment is good, the investment is large。 if the investment is small, its enforceability is poor。 if the investment is large, its operability is high. All these make it difficult to set down which one is better. “The Guide for New Concept of Highway Design” which is piled by the Ministry of Transportation has proposed to establish a design concept of “the cost of full lifecycle”,that’s to say, the road lines should be interpared in such stages as construction, maintenance, operation and management,and both the construction cost and operating cost should be taken into account. In addition,we need to carry out the economic analysis in the feasibility study for the road’s 77 construction,and to carry out the analysis in terms of economy and social benefits when paring the schemes of parts of the road, so that the linebit and its technical indicators could be settled down by its service level and the benefits for economy and society. . The protection for water resources At present, our country’s intensity of controlling water pollution is increasing year after year, and people have realized that the seriousness of ecological deterioration caused by water pollution. So when reservoirs, lakes and other water bodies get involved in the process of line selection, we should pay special attention to whether these water bodies are the residents’drinking water sources or not. Because the water on the pavement will cause contamination, direct discharging the above water bodies will damage the w。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。