外文翻译--城市道路沥青混凝土路面的施工技术(编辑修改稿)内容摘要:

raw materials, to the owners of the professional laboratory designated to do ahead of time to do a good job as far as possible, preferably before the pletion of reserve materials. Mixing field settings need to be fully considered in the transport site on the location of economic rationality, the venue should be large, flat, and the surrounding environment and residents of no effect, and not subject to flooding intrusive. To minimize the production area and living area separated from the living area and the wind in the E Department. Road transport to site formation, convenient access to vehicles of all kinds of machinery to facilitate the Uturn, reduce mutual interference, at the same time to fuel and asphalt, such as flammable liquids and a variety of heating and power settings separated. Power consumption is selfor grid access must also consider the power sector. Materials preparation. Required to do a good job in all kinds of asphalt pavement materials procurement is very important to take the quality of materials is the quality of asphalt Concrete pavement of the most important factor in good or bad. Equipment installation and debugging. Mixture of asphalt concrete mixing and production quality of the firefly, and the selected asphalt mixing plant has an important relationship between the mixing equipment to be able to meet the project requirements and the continuity of the work requirements. In short, the equipment in the selection of E to the low failure rate and superior performance is better. The provision of face. Asphalt concrete pavement surface is rigid on the grassroots, grassroots strength, roughness, deflection of the size of two layers of asphalt concrete are related to the impact of soxia to provide a neat, clean and have sufficient strength face is necessary to sprinkle the grassroots level above a certain amount of prime coat cloth oil, asphalt concrete between the surface layer of oil onto sticky cloth. 3 paving technology Asphalt Concrete transport Asphalt concrete transportation officer with more than 15t Dump Truck, dump in the car before loading with a layer of clean diesel and water mixture to prevent the viscous material. In addition, the installed thermal insulation material to use cloth car cover, and then can be played. Transport time normally should be no larger than . asphalt mixture paction and molding asphalt mixture paction Shop paragraph to try to determine the position and the rolling speed, immediately after the paver into the early pressure, plex pressure, final pressure in three phases, Asphalt Concrete Pavement general use of steel wheels and wheel roller Yi paction roller to plete the work of the joint operation. SubRCC, and the l。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。