外文翻译--卫浴间装修要点(编辑修改稿)内容摘要:
ver, in the face range of sanitary ware, consumers often do not know how to choose. Introduced a line of people should pay attention to the following matters. Bathroom space, Sandal Jean, the first is washing pots, also known as handwash basins, mostly ceramic products, it hard, wearresistant, pollution prevention, but also encountered fierce collision ruptured. Washing pots of various shapes and sizes, from the square, round, oval to Lightship has a halfwall. If there is more room, the best choice of the larger washing basin. This was followed by the toilet. Toilets in the choice before the first clear toilet are set aside under the drainage outfall or horizontal drainage. If the next drainage, good drainage inlets centre of the distance to the wall, and then select the same distance from the toilet, if Wang is drainage, drainage inlets to the ground up to the height of Toilets for drainage inlets and outlets to the same high degree of Or slightly higher, to ensure smooth drainage. It has a floorandtwo wallmounted, according to the needs of their own choice. If the toilet, wash vanities, bath San Dalian the unanimous choice of colors, and the toilet and the floor tiles and wall color coordination with the words, the whole bathroom space style will be much unified. Finally, there is bathed in the District, which includes bath and shower cubicle two. Shower cheap and save water, shower bath water just onethird. Optional shower facilities, it is necessary to consider how the door or Gaping most suitable for your bathroom. If we choose the appropriate size of a bathtub, to be considered include not only its shape and style, fort, placement, the tap variety, texture and materials and manufacturers, the purchase of the former inspection of its depth, width, length and Way line. Bathtub manufacturing materials generally fall into three categories: including acrylic, steel and cast iron. Acrylic is more mon, it will not rust and damage difficult, and very light, while acrylic is usually at the bottom of the tub with glass fiber, to strengthen capacity at the bottom of the support, but there are many advantages If warming and feel, the water temperature can be maintained longer period of time, such as clean and easy cleaning. Matching bathroom equipment The Ministry of Health in a welloff countries in the residential standards: reasonable to separate toilet, reduce Biennia, toiletries, laundry and wash your face makeup of mutual interference. Toilet function has been to the toilet with a singledirection. Ask for the special Kebanchushen, Huang family buildings with experts, small toilet, a welloff to reflect the characteristics of the times, in fact demanding the decorating, which gain a lot, including the design layout, color match, the choice of materials Construction, pipeline arrangement, each link can not be taken lightly. matching bathroom equipment General ordinary residential bathroom, install heating, lighting, exhaust threeinone Yuba, ordinary bathtub, Toilet, desktop vanities wash, rinse with hot and cold, Bath curtain, towels planes, such as bath mirror. The ground, with ceramic tile walls, the ceiling at the top may be plastic sheeting. The small size of the bathroom, attention should be paid reasonable use of limited space, shower bath than is the economy and convenience, washbasin can be bracketstyle, wall space available to do less closet, mirror me, to put more sporadic items . After the wall of doors can be installed linking pegged for such items. Apartment or villatype toilet, can be installed Jacuzzi, nonslip bath, multinozzle shower, thermostat Tap, marble panels Mansion makeup Taiwan, the electric hairdryer, shaving, largebath, hot air hand dryers, And women Janssen, etc.. Strut channels available at the top of keel or aluminum ceiling, the roof can be used PVC boards or panels, such as aluminumplastic sheet. Wall art can be laying tiles or brick, ground antiskid is the first choice of color glazed tiles. Conditions permit, can be installed to warm the thermostat and munications equipment. The bathroom walls, the general ground of white, light green, Mei Guise, and so on. Sometimes can also sanitary ware as a main colors, and the walls, in contrast to the ground so that the toilet showing a threedimensional sense. The choice of sanitary ware from the overall design considerations, as far as possible in harmony with the overall layout. Save room shower area Shower on the market is relatively hot products. Especially since last year, when many people are in love with decorating. On the market now mon shower: Vertical angular: a view from a square shape, curved, diamondshaped。 structure at a pushpull doors, Shadier Men, shaft doors, and so have the means to enter the corner to enter or Singleaccess, access to the angle of the greatest characteristics is to make better use of limited bathroom area, expanding utilization of the mon square angular shower and curved shower, diamondshaped shower is such, is the application of more Many models. A bath shaped screen: Some chamber or the narrow width of a bathtub, but the head of household and do not want to use bath and shower selection screen, use a shower shaped screen. Bath tub on the screen: Many households have installed a bathtub, but they often use the shower, to take into account that the two can also be produced in the bath tub on the screen, the general shape of a bathtub, with reduced or total collapsethe more mon, but the cost of High and uneconomical. Toilet seat on the distance Toilet is very particular about the selection。 it was thought that as long as the luxurious appearance and the bathroom tiles will be able to match the color. In fact, as aperture choose the right。外文翻译--卫浴间装修要点(编辑修改稿)
相关推荐
Upon receipt of an ACK, the transmitter sends the next packet. If the transmitter receives a NAK, it resends the same packet. Transmission proceeds in this manner until the entire file has been
ving much of the risk in uncertainty, thereby allowing those concerned to achieve more control over the destiny of an organization, and thus creatively exercising the role of management leadership
甲烷数量无法获得,因此该模型只包括二氧化碳, NOz排放。 该模型的结构图 1所示。 在这个模型中的输入输出关系如下 : 输入层节点数被选择作为与输入参数相同的参数, R=4,输出层节点的数目是作为与输出参数相同的参数, P=2, E0 被 设置为 %。 试验数据是根据测试得出的,测试发动机的规格在表 1中已经给出。 有 100组以上的数据是在轻载低转速到高负载高转速下得出的,这是为了试验
第十五篇 新版出差费用计算表 出差费用计算表出差报告资料一览表科 签章出差费用计算表科 签章资料 1 借 支 元 元 有无收据2 机票费用 元 有无3 交 通 费 元 有无4 住 宿 费 元 有无5 餐 费 元 有无6 交 际 费 元 有无邮 电 费 元 有无附图 1 资 料 费 元 有无2 翻 译 费 元 有无其 他 元 有无记录 1。 录景带 张 2·录音带 张 合 计 元扣 除
数据。 经还原处理的薄膜的 PL 峰位置被发现经常保持在 390nm 左右,变化小于177。 10nm。 可以看出,当沉积 GO 薄膜 PL强度弱的时候,短期和肼蒸气接触会导致 PL强度的显著增加。 有趣的是,这一趋势在和肼蒸汽接触 3分钟后能够逆转。 较长的接触导致 PL信号最终淬灭。 应当提到的是,在真空中 200 ℃ 通过热退火也会导致较弱的 PL信号(见支持信息)。 还原 3分钟的
大的能量用来克服浆料的流阻力。 但是,如果注浆压力非常高,并且达到临界值,那么谐振器中的空气不能立即排出,并且由于不利高温,充填长度将降低,并且也可能会造成湍流 [13];因而,如果要预 防 湍流,必须选择增高的注浆压力。 从图 3还可以看出,当注浆压力增加,如果活塞速度也同时增加,充填长度将增加。 例如,当活塞速度 是 m/s, 如果注浆压力增加到 25MPa,充填长度将高达 240 mm,