外文翻译--中国道路交通的管理(编辑修改稿)内容摘要:
ls for effective roadsafety is not enough to implement measures that improve legislation, roads, vehicles, roaduser behavior, and postcrash response。 one of the key activities is to organize effective and efficient roadsafety management (United Nations, 2020). According to TRB (2020), “management is the direction of resources to attain defined Objectives. Recent crash statistics Table 1 lists the key statistics for China. Figure 5 shows the number of road fatalities for 2020 through 2020. Key statistics for China (WHO, 2020). Population 1,336,317,116 Gross national ine per capita, US$ 2,360 Number of registered vehicles (2020) 145,228,994 Reported road traffic fatalities (2020) 89,455 Road fatalities per 100,000 of population Road fatalities per 100,000 of registered vehicles Figure 5. Number of fatalies from 2020 through 2020 (Traffic Administration Bureau ,Ministry of Public Securitof PRC, annual). The largest categories of fatalities among road users in 2020 were motorcyclists (27%), followed by pedestrians (25%), passengers (17%), bicyclists (14%), car and truck drivers (10%), and drivers of minivans, SUVs, and buses (7%) (Traffic Administration Bureau, Ministry of Public Security of PRC, annual). From 2020 to 2020, the number of fatalities in each roaduser category decreased, with the largest reductions for passengers Key governmental agencies in charge of road safety The key government agency in charge of road safety in China is Traffic Administrative Bureau, Ministry of Public Security. Under the central government, each province and county has a corresponding branch department. These departments are responsible for traffic enforcement and driver licensing. The Ministry of Transportation is responsible for road building and driver training. Each level of local government has a transport。外文翻译--中国道路交通的管理(编辑修改稿)
相关推荐
a policy of developing and growing talent inhouse is in place. A succession planning system is now in development to further enhance this. Continuous improvement is one of the core values, and models
and Miller 1963。 Miller 1977), firms have to trade off between the costs of financial distress, agency costs (Jensen and Meckling 1976) and tax benefits, so as to have an optimal capital structure.
ble of carrying out specific operations. Once the designing activities have been pleted and the models chosen, tools and equipment are prepared and internal or external manufacturing begins (second
and Yeung. The critical role of property rights in capitalist economies is being increasingly evident. Societies must protect innovators’ property rights to the gains from their innovations. An
as growing, with the latter remaining rural places while the former took over many of the characteristics of an urban settlement. As the primary node of the regional urban system, the township towns
is a differentiating factor between SMEs and LOs brand management. The evaluation of brand strategies may be a problem for SMEs. Brand strategies. Multinational corporations seem to follow the