外文翻译---锻件的先进制造系统(编辑修改稿)内容摘要:
cially the precision that can beachieved for the tool production is significant.Moreover the wear of the tool needs to be reduced to aminimum possible value, since the degree of wear is essential for the precision that can be achieved. The time betweenmaintenance of the tool can be increased significantly byreducing friction between product and die.Another significant issue for reducing the friction andtherefore minimizing tear and wear is the permanent monitoring and control of the process parameters that arerelevant for the product quality. A closed loop processcontrol of die and product temperature and forces enablesa documentation and online statistical analysis for instantfeedback not only concerning the tool wear, but the information is essential for production management system aswell.3. Process design for precision forgingNot only the product and tool need to fulfil enhancedspecifications due to the higher degree of precision. Theprocess needs to meet the requirements to be flexible, quickand efficient. As mentioned above.To reach a flexible, quick but stable precision forgingprocess, attention has to be paid to the sensitivity of theforging process. One issue already mentioned above is theprecision and temperature exactness of the tool and product.Another important issue is the flexibility and accuracy of thematerial handling gear especially for the positioning of partson the aggregates and the aggregates itself as well.Since the use of forging aggregates themselves is onlylimited flexible due to the monly inflexible tooling, it iscrucial that a rapid exchange of tools is possible, as well asthe exchange of whole aggregates like preforming units andthe flexibility of the handling gear.A possibility to improve the reliability and to reach ahigher reproducibility of the forging process is to increasethe degree of automation and to introduce an online processmonitoring and control system [3]. Automated processes aremore reproducible and less susceptible for human failures,which are especially harmful for precision forging. The partsneed to be positioned exactly in the die otherwise thedistribution of mass is not guaranteed to be sufficient. Withconventional forging processes this subject is not so relevantsince the flash can pensate slight invariances of positioning.Because of the high modularity and flexibility of theforging line with the possibility of changing and biningponents, special requirements have to be fulfilled by thecontrolling unit. For the project IPH chose the bustechnology and a PCbased controlling intelligence. This controlsystem can be used to independently and separately coordinate shearing, heating, forging, cooling, clipping and material handling. Special requirements for a controlling systemused in the forging industry is its resistibility to the influenceof dirt, heat, vibration and strong electromagic fieldsfrom the inductive heating systems, which is ensured bythe Profibus system [7]. Such a system can be controlledby a PCbased system which enables a simple and quickintegration of additional units that are added with an serialconnection. Furthermore it allows an easy exchange ofaggregates only by connecting the bus to the added aggregate and integrating the new object to the control software.The sample forging line which will be described (Fig. 7)was developed for a flashless precision forged gear wheel[4].Thefirst stage of the forging process are the billet shearson which raw parts are produced. After shearing the slugswill pass an inductive heating system to warm them to1200 8C. A multiaxis robot supplies the heated slugs tothe forging press on which the forgings will be produced inone forming stage by closed die forging. During this processcooling, lubrication and cleaning of the die elementsare carried out with a moveable nozzle. After the forgingprocess an aggregate for controlled heat treatment isinstalled. The forged part can later be punched by a clippingpress and final measurement and quality control of theforged products should be performed for example on a3D coordinate measuring machine.An important issue for controlling the automated processis the collection of process data via sensors. The temperatureof the slugs and the forging tools has to be held in a steadystate. Here the temperature of the slugs is measured with apyrometer and especially in the warm up phase or afterbreaks not correctly warmed parts are sorted out. Anotherpossibility to get a more stable process is to control theFig. 7. Automated forging line.S. Reinsch et al. / Journal of Materials Processing Technology 138 (2020) 16–21 19die temperature. This can be achieved by controlled coolingor heating by means of fluids, like spray cooling or fluidcooling in the cope of tool. To control the wear of the die,the measurement of the press force and the die strain arepossible solutions.For process automation the handling of parts and theachieving of a certain mass distribution by the integrationof a rolling aggregate in the forging cell are the mainproblems.4. Production management systemApart from a highlevel of automation and a configurationthat enables a f。外文翻译---锻件的先进制造系统(编辑修改稿)
相关推荐
第一篇 新版出差申请单(一) 第六章 出差制度出差申请单(一)部门: 申请日期: 年 月 日职别卡号: 职别出差人 姓名职务代理人姓名签名出差要办事项出差地点出差时间自 年 月 日 时起共 日 至 年 月 日 时止 主管: 申请人:
ivations, used for temperature pensation and additional control functions. When having photosensitive properties of PN junction by irradiation, formation, thus resulting in the light of photocurrent
on to credit restrictions, wage controls, contraction of the money supply, reduction in demand by raising taxes, increased demand by reducing taxes, enlarged supply of goods through greater
有一定的 制约。 产品 开发 不仅在功能规格 上 需要考虑 ,在 具体的精密锻造 上也要考虑 , 而不是 在许多情况下迫使该产品的设计通过。 在一份联合成立 BMBF 的目标是 针对这些 项目 , 包括产品设计,组织和信息技术方面的文章中所描述的布局和运作的制度,先进的锻造行动数将达到平衡。 在描述该项目的 努力之前, 我们 先 描述精密锻造及它对工艺设计和生产控制的修改要求。 2. 精 密锻造
eivable and inventory management. or the variations of any current asset accounts or liability accounts across industries. Thus. mixed evidence exists concerning the use of working capital management
s will be pared. Scenario (1) is the base scenario, while scenario (2) will be the scenario in which the material removal rate is increased for the purpose of reducing processing time. The constants