外文翻译---论网站建设技术(编辑修改稿)内容摘要:
cript and the emergence of making information between users is not only a display and browse the relationship, but to achieve a realtime, dynamic, crossexpression. Thus based on the CGI static HTML pages will be to provide dynamic realtime information, and customer response to the operation of the Web pages replaced. javascript scripting is satisfy this demand arising from the language. It39。 s loved by extensive user. Many scripting language it is in a relatively good. WWW and effectively achieve the bination of the puter work puting and work blueprint. 4. Construction on the site Experience With the popularity of the Inter, more and more government departments, panies and individuals aware of the need to have their own independent Web site. Below on the design and production sites on some of their own experience. After conducting systematic analysis End, we should carry out system design. Web page design similar to the development of software design, topdown, bottomup and continuous updating, and other design methods. The main task is to design the content of the sites, including the website information organization structure, appearance, content block, navigation and links, directory structure design. System design is the site ready before the concrete realization of the website to further the realization of more specific requirements, the overall effect on the website, local details have a clearer idea. This entire process is the key site planning. Next is how to achieve their own Web site design issues. The realization of the site, I think the need to be considered in two parts: the realization website。 Web servers can be achieved. In the process of achieving website, technology selection is very important. Former major use HTML language, the stronger the interactive website, the proposed use of ASP, JSP, PHP and other programming to help achieve, the more plex Web site may also have its own database. The latter is based on all kinds of different operating systems used Web server software installation and debugging. This stage is the whole process of the most important and most timeconsuming part. When we pleted the work, the need for website released. At this stage of the production on the website drawing to a close, th。外文翻译---论网站建设技术(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。