外文翻译---精密注射成型技术的研究进展(编辑修改稿)内容摘要:
fecting the precision of the parts made, so in Precision molding should maximize the use of fully automatic mode [14]. The Temperature Control of Precision Injection Molding Machine, And A New Design of Screw. Injection barrel automatic thermostat on the cycle of sexual relations and the opening of the stove to melt density and viscosity changes. Products thus affecting the quality and accuracy of the cyclical fluctuations。 injection molding machine nozzle close to the mold cavity. Therefore, the nozzle temperature of molding ponent will have an important impact. 4 Precision Molding Technology Application of The Mold Injection Compression Molding (ICM) Technology ICM Technology is the means to open a certain distance from the mold under the conditions of the beginning injection, injection of a certain amount, close to the beginning die cavity melt implementation of the pression, Die pletely closed at the termination of injection, and then packing, cooling until the removal products. The Highspeed Injection Molding Highspeed injection molding method of filling melts faster than traditional fast 10 ~ 100 times, so that melt in a mold cavity to produce high shear flow and viscosity, mold filling fast, plastic surface hardening slowed, will be enhanced thinwall molding thickness limit, inhibit excessive molding pressure and lowpressure die as mobile, products, the lower the stress. No Guarantee Pressure Injection Molding Without packing injection molding technology is referred to the plastic melt in highspeed, high pressure filling into the mold, then close to the nozzle needle, a plastic mold cavity melt automatically cover all parts of the product contraction Such products can greatly reduce the warpage. Other Intelligent Control Technology Precision injection molding process on the processing conditions for continued monitoring and accurate control is very important. With the development of puter technology, puterized injection molding has been widely used . 5 Conclusion The growing requirement of plastic products for high accuracy and high performance requirements is the momentum for sophisticated injection molding technology forward. People of precision injection molding understanding of the principle is the continuous deepening of precision injection molding technology t。外文翻译---精密注射成型技术的研究进展(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。