外文翻译---电子安全报警系统(编辑修改稿)内容摘要:

arm signal is received by way of sound and light show, and the screen also shows the specific fire floor and room number, the plane stopped taking the first alarm clock to record the timing, use of the machinespecific phones, but also quickly to the fire alarm to give directions and. In addition, you can control the fire extinguishing system or signal transmission to the fire control room. Automatic fire alarm system is by the trigger devices, fire alarm, fire alarm devices and other auxiliary functions of the device with the position of a button fire alarm system fire alarm system. It can fire early stages of burning smoke, heat and light radiation and other physical quantities, by temperature. Photographic and other smoke and fire detectors into electrical signals, transmitted to the fire alarm controller, and also shows the site of the fire, the fire record of the time. General fire alarm system and automatic sprinkler system, fire hydrant systems, smoke control systems, ventilation systems, air conditioning system, fire doors, fire shutter, smoke screen and other related equipment interaction, automatically or manually issue mands to start the corresponding device. (A) of the trigger devices in automatic fire alarm system, automatic or manual fire alarm signal devices generate called trigger conditions, including fire detectors and manual fire alarm button. Fire detector is able to fire parameters (smoke, temperature, flame radiation, gas concentration, etc.) response, and automatically generate a fire alarm signal devices. Fire response parameters according to different fire detectors into heat detectors, smoke detector, sensitive fire detectors, bustible gas detectors and fire detectors five basic types of posite. Different types of fire detectors for different types of fires and different places. Manual fire alarm button fire alarm signal generated manually start the automatic fire alarm system devices, automatic fire alarm system is an indispensable ponent of the. (B) the fire alarm device in automatic fire alarm system to receive, display and transmit fire alarm signals, and can send control signals and control functions with other auxiliary equipment as the fire alarm device instructions. Fire alarm control is one of the most basic kind. Charged with the fire alarm control fire detectors provide a stable working power。 detector and the working status of the system itself。 the reception, conversion, processing a warning of fire detectors Shuchu。 Jinxi ng sound and light alarm。 Zhishi specific location and alarm time。 the same time supporting the implementation of appropriate control and many other tasks. Fire alarm system is a core ponent. In the fire alarm devices, some devices such as break, regional monitors, fire shows and other functions can not plete disc alarm device, which can be r。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。