外文翻译---电子信息专业介绍及发展-电子信息(编辑修改稿)内容摘要:
engaged in the production, installation and missioning, operation and maintenance, sales and aftersales service of some related products and equipment to promote the development of market economy. The market demand for that type of talent is growing. Therefore such kind of talents has a wide range of job prospects. Graduates may engage in the research, design, manufacture, application and development of electronic equipment, information systems and munications systems,. 2. Professional Training Requirements The students mainly study the knowledge about the acquisition and processing of signal, power plant equipment system, etc., and students have to accept the basic training on electronic and information engineering practice to equip them with the capabilities on design, development, application and integration of electronic equipment and information systems. The knowledge and abilities should graduates acquired are: 1). systematically grasp the foundation of theoretical knowledge, and adapt to wide range of job on electronic and information engineering scope。 2). master the basic electronic circuit theory and experimental techniques, able to analysis and design the electronic equipment。 3). access the basic theory on information acquisition, processing and the general method of application, able to design, integrate, apply and simulate information systems by puter。 4). Know about the basic principles, policies and regulations of the information industry, understand the basics of business management。 5). Know about the advanced theory on electronic equipment and information systems, have the initial ability to do research, develop new systems and new technologies。 6). master the basic method of the literature search, data query, has the capacity to do some scientific research and practical work. 3. The Training Objectives Though learning and understanding of the course, students should understand the importance of these subjects, by which they will have a more detailed understanding to their major. Let’s take the Subject: Communication as an example. We all know that munication, as a practical system, appears to meet the needs of society and individuals to deliver messages (data, voice and images). In。外文翻译---电子信息专业介绍及发展-电子信息(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。