外文翻译---混凝土梁桥的结构形式(编辑修改稿)内容摘要:
er which shear keys between adjacent units are filled with nonshrinking mortar .For highway spans ,an asphalt wearing surface may be applied directly to the top of the precast concrete .In some cases ,a castinplace slab is placed to provide posite action . The voided slabs are monly available in depths from 15 to 21 in .and widths of 3 to 4 ft .For a standard highway HS20 loading, they are suitable for spans to about 50 ft, Standard channel sections are available in depths from 21 to 35 in a variety of widths, and are used for spans between about 20 and 60 ft .The hollow box beamsand singletee girders are intended for longer spans up to about 100 ft. For mediumspan highway bridges ,to about 120 ft ,AASHTO standard I beams are 4 generally used .They are intended for use with a posite castinplace roadway slab .Such girders often bine pretensioning of the precast member with posttensioning of the posite beam after the deck is placed .In an effort to obtain improved economy ,some states have adopted more refined designs ,such as the State of Washington standard girders. The specially designed precast girders may be used to carry a monorail transit system .The finished guide way of Walt Disney World Monorail features a series of segments, each consisting of six simply supported pretensioned beams ,together to from a continuous structure .Typical spans are 100 to 110 ft . Approximately half of the 337 beams used have some bination of vertical and horizontal curvatures and variable super elevation .All beams are hollow, a feature achieved by inserting a styrofoam void in the curved beams and by。外文翻译---混凝土梁桥的结构形式(编辑修改稿)
相关推荐
the engine when the vehicle is moving and do not need a second generator to charge the batteries. Series/Parallel Hybrids Combined hybrids have the features of both series and parallel configurations
EMBED = 1 Inputs the multi outputs, the change plex characteristic in view of the system, this system uses in the intelligent control the fuzzy control technology (Fuzzy Control, is called FC) to
nhearth, coke, and natural gases) flatflame burners in the boilers of cogeneration stations at metallurgical plants in Ukraine and Russia. Unfortunately, we have to state that, even at present, those
109 页 temperature gradient, so an additional one on the surface tensile stress, thermal stress superposition and hydration, coupled with the shrinkage of concrete, Tensile stress to reach the surface
edge of the score, five key points were selected and their coordinates were measured. The width and depth of the score were then measured. In addition, a circular arc fit to these five points was
e lower part is 3%, ground 2%)The air that passes the doors and windows blind side permeate hot lose to have 23% about。 The region in Harbin, pass to round to protect structure to transmit heat hot