外文翻译---浅谈建筑环境与暖通空调能耗-暖通(编辑修改稿)内容摘要:
e lower part is 3%, ground 2%)The air that passes the doors and windows blind side permeate hot lose to have 23% about。 The region in Harbin, pass to round to protect structure to transmit heat hot lose about 71% of have the all hot loss。 (among them outside the wall is 28%, the window is 28%, the house noodles is 9%, the veranda door the lower part is 1%, the outside door is 1%, ground 4%)The air that passes the doors and windows blind side permeate hot lose to have 29% showed from this an improvement to round hot work function of protect the structure air condition economy energy to have important meaning for the warm. Influence constructed the programming design an air condition economy energy to the warm Program a design construct the important aspect of[with] the economy energy design, programing economy energy a design should choose an address from the construction,cent area,the building and road set up an alignment,building directions toward,building type of figure,building be apart from,winter monsoon predominance direction,the sun radiation,building the exterior space environment constitute etc. carry on a research. With excellent turn the tiny weather environment of the building。 Be advantageous to economy energy, full value and make use of the solar energy,winter predominance direction of wind,geography and geography, make use of natural design of economize on energy the programming is the beneficial and disadvantageous influence of decision factor,the radiation factor,the atmosphericcirculation factor and the geography factor that analyzes to make good, passing a building of the programming layout carries on to the abovementioned factor full make use of,reformation, bee to live a condition and be advantageous to the tiny weather environment of[with] economy energy flank of the building of green turn to have already defended breeze and separate a voice,dust palliative and beautify environment not only of function, and for building the economy energy also has an important function. Because the tree can absorb humidity from the root first, leading leaf39。 s noodles to evaporate together, lowering the air temperature thus, secondly the tree is good hide the sun function, make thus the building be subjected to directly of the sun radiation and get from the ground of the radiation heat reduce, two is the function that the tree has leading breeze and blocks addition, the ground will reflect the sun radiation not only, and its radiation bee again after go up new of hot radiation grow grass and plant trees as far as possible, avoid the ground soil bare, and reduce the otiose and b。外文翻译---浅谈建筑环境与暖通空调能耗-暖通(编辑修改稿)
相关推荐
edge of the score, five key points were selected and their coordinates were measured. The width and depth of the score were then measured. In addition, a circular arc fit to these five points was
109 页 temperature gradient, so an additional one on the surface tensile stress, thermal stress superposition and hydration, coupled with the shrinkage of concrete, Tensile stress to reach the surface
er which shear keys between adjacent units are filled with nonshrinking mortar .For highway spans ,an asphalt wearing surface may be applied directly to the top of the precast concrete .In some cases
chanisms, it may contribute to achieving the aim of creating trust in emerce and viable redress for consumers. There are several different mechanisms for ODR to which we turn next. 2. ODR Mechanisms
ology forecasting underground spontaneous bustion fire, such as infrared thermometer and infrared thermal imager to detect the coal wall, coal pillar and float coal heap of spontaneous bustion, which
er determination of drawn steel wire in case of obstacles in the middle. Such as Angle steel, wire, etc., must be in advance expenditure point on both ends right now, in order to make steel wire