外文翻译---汽车变速箱动态建模轮齿局部缺陷的早期检测-汽车设计(编辑修改稿)内容摘要:
ng, spalling, crack and broken tooth. A singledegreeoffreedom model is used which include the e4ffects of variable mesh stiffness, damping, gear errors, profile modifications and backlash. The effect of timevarying meshing damping is also included in this case, The solution is obtained by using the harmonic balance methods. A method of calculated the optimum profile modification has been proposed in order to obtain a zero vibration of the gear pair [57]. They also proposed a linear approximate equation to mode the gear pair by using a singledegreeof freedom model Gear rattle vibration is a undesirable vibration for passenger cars and light trucks equipped with manual transmissions. Unlike automatic transmissions, manual transmission do not have the high viscous damping inherent to a hydrodynamic torque converter to suppress the impacting of gear teeth oscillating through their gear backlash. Therefore a significant level of vibration an be produced by the gear rattle and transmitted both inside the passenger partment and outside the vehicle. Gear rattle, idle shake, and other vibration generated in the automobile driveline have bee an important concern to automobile manufactures in their pursuit of an increased level of perception of high vibration quality. The torsional vibration o driveline is a major source of gear rattle vibration. The manual transmission produces gear rattle by the impacting of gear oscillating through their gear backlash. The impact collisions are transmitted to the transmission housing via shafts and bearings [8]. The gear pair dynamic models including defects have been done by [9]. The study 第 4 页 共 7 页 suggests that little work has been done on modeling of gear vibration with defect and an accurate analytical procedure to predict gear vibrations in the presence of local tooth fault has yet to be , the purpose of this paper is to develop a multidegreeoffreedom nonlinear mo。外文翻译---汽车变速箱动态建模轮齿局部缺陷的早期检测-汽车设计(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。