外文翻译---污水处理-环境工程(编辑修改稿)内容摘要:
e oil, grease and lighter solids float to the surface. The settled and floating materials are removed and the remaining liquid may be discharged or subjected to secondary treatment. Secondary treatment removes dissolved and suspended biological matter. Secondary treatment is typically performed by indigenous, waterborne microorganisms in a managed habitat. Secondary treatment may require a separation process to remove the microorganisms from the treated water prior to discharge or tertiary treatment. Tertiary treatment is sometimes defined as anything more than primary and secondary treatment. Treated water is sometimes disinfected chemically or physically (for example by lagoons and microfiltration) prior to discharge into a stream, river, bay, lagoon or wetland, or it can be used for the irrigation of a golf course, green way or park. If it is sufficiently clean, it can also be used for groundwater recharge or agricultural purposes. Pretreatment Pretreatment removes materials that can be easily collected from the raw wastewater before they damage or clog the pumps and skimmers of primary treatment clarifiers (trash, tree limbs, leaves, etc). Screening The influent sewage water is strained to remove all large objects carried in the sewage stream. This is most monly done with an automated mechanically raked bar screen in modern plants serving large populations, whilst in smaller or less modern plants a manually cleaned screen may be used. The raking action of a mechanical bar screen is typically paced according to the accumulation on the bar screens and/or flow rate. The solids are collected and later disposed in a landfill or incinerated. Grit removal Pretreatment may include a sand or grit channel or chamber where the velocity of the ining wastewater is carefully controlled to allow sand, grit and stones to settle. Primary treatment In the primary sedimentation stage, sewage flows through large tanks, monly called primary clarifiers or primary sedimentation tanks. The tanks are large enough that sludge can settle and floating material such as grease and oils can rise to the surface and be skimmed off. The main purpose of the primary sedimentation stage is to produce both a generally homogeneous liquid capable of being treated biologically and a sludge that can be separately treated or processed. Primary settling tanks are usually equipped with mechanically driven scrapers that continually drive the collected sludge towards a hopper in the base of the tank from where it can be pumped to further sludge treatment stages. Grease and oil from the floating material can sometimes be recovered for saponification. Secondary treatment Secondary treatment is designed to substantially degrade the biological content of the sewage which are derived from human waste, food waste, soaps and detergent. The majority of municipal plants treat the settled sewage liquor using aerobic biological processes. For this to be effective, the biota require both oxygen and a substrate on which to live. There are a number of ways in which this is done. In all these methods, the bacteria and protozoa consume biodegradable soluble organic contaminants (. sugars, fats, organic shortchain carbon molecules, etc.) and bind much of the less soluble fractions into floc. Secondary treatment systems are classified as fixedfilm and suspendedgrowth. Fixedfilm OR attached growth system treatment process including trickling filter and rotating biological contactors where the biomass grows on media and the sewage passes over its surface. In suspendedgrowth systems, such as activated sludge, the biomass is well mixed with the sewage and can be operated in a smaller space than fixedfilm systems that treat the same amount of water. However, fixedfilm systems are more able to cope with drastic changes in the amount of biological ma。外文翻译---污水处理-环境工程(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。