外文翻译---氧化沟工艺在污水处理中的应用与发展-环境工程(编辑修改稿)内容摘要:
nt years usage still contain underwater push machine 3. The Carrousel oxidizes the mechanism of the ditch The Carrousel oxidizes the ditch handles dirty and aqueous principle The at the beginning mon Carrousel oxidizes the dirty water In inside In craft of the ditch direct with dirty mire In reflux together enteroxidize theditch surface spiritmachinemakesfuse In the liquid of admixture the density of the oxygen DO increases about 2 the 3 mgsl this kind of well the term of the oxygen, the microorganism gets the enough deliquescence oxygen es and go to divided by the BOD。 At the same time, the ammonia were too oxidized nitrate with second nitrate, this time, mix with the liquid be placed in the oxygen the spirit machine downstream, after water current be bee by the swift flow appearance of the spirit District oP even flow the appearance, the water current maintainsin theminim umcurrentvelocity,guaranteeingthe liveand dirty mire be placed in the floats the appearance.( average current msl s)Oxldlze microbially the process consumed to fuse theoxygenin thewater,until thevalueofDOdeclinesforzero, mixing with the liquid report the anoxia nitric that turn the function through anoxia area, mix with the liquid enter to have the oxygen area, pleting once system inside, the BOD declines the solution is a continuous process, the nitric turns the function to turn with the versa nitric ~e function ta ke place in same of structural restrict, this kind of oxidize the ditch although can then valid whereabouts BOD, divided by the phosphorus take off the nitrogenous ability ltmrtedt. The Carrousel oxidizes the ditch divideds by the phosphorus takes off the nitrogenous influence factor. Affecting the Carrousel oxidizes the ditch divideds by the phosphoric factor is dirty mire, nitrate density and quality densities research expresses, being total and dirty mire as 11% that a hour biggest phosphorus 4% with deal is its fuck dirty mire deal within live and dirty mire, keep for the the germ physical endowment measures, but when dirty mire over 15 d hour dirty mire the Inside is biggesttocontain theobviousdescentindealIn phosphorus,canning not reach the biggest divideding by the result of phosphorus on the , prolong persistently the dirty mire (for example 20ds,25ds,30ds) is to have no necessary, proper choose to use within the scope of 8~ 15 the same time, high nitrate density with low quality density disadvantage in divided by the process of phosphorus . 4. The Carrousel oxidizes problem and solution methods of the ditch esse. Though the Carrousel oxidizes the ditch has a water fluid matter good, the antipounds at the burthen ability strong, divided by the phosphorus take off the nitrogen efficiency. But, in physically of movement process, still exstts a series of problem. Dirty mire inflation problem When discard the aquatic carbohydrate more, the N, P contains the unbalance of deal, the pH value is low, oxidizing the dirty mire in inside in ditch carries high, fuse the oxygen density the shortage, line up the mire not etc. causes easily dirty mire in germ in form in silk inflatlon。 Not the dirty mire in germ in form in silk inflation takes place primarily at the waste water water temperature is lower but the dirty mire carries higher microbial burthen is high, the germs absorbed the large quantity nourishment material, is low because of the temperature, metabolism the speed is slower, accumulating the rises large quantity is high to glue sexual and many sugar materials, making the surface of the live and dirty mire adhere to the water to increase consumedly, SVI the value is very high, being the dirty mire inflation. Cause that aim at the dirty mire inflation, can adopt the different counterplan:From the anoxia, water temperature high result in of, can enlargement tolerance or lower into the water measures to alleviate burthen, or the adequacy lowers the MLSS( control dirty mire reflux measure), making need the oxygen measures the dirty mirecarrieshigh, can increaseMLSS, toadjusttheburthen, necessity Foam problem Becauseentering totakethe greaseoflarge quantityinthewater, handling system can39。 t pletely and availably its obviation, parts of greases enriches to gather in in the dirty mire, through turn to brush the oxygen agitation, creation large quantity foam。 The mire is partial to long, the dirty mire is aging, and also easy creation topourthewaterordivided bywiththesurfacetheof do away with the foam, in mon use divided by the an organism oil, kerosene, the oil of stncon, throw deal as ~ mgsl to increase dirty mire in pond in spirit in density or adequacies let up the tolerance of ,also can control the foam creation contain the live materia! in surface in the waste water more, separate with the foam easily and in advance method or other methods do away can consider to increase to establish a set of dlvideding by the oil device enhance most importantly the headwaters manage, reducing to contain the oil over the high waste water and other poisonous waste water of into[llJ. Float the problem on the dirty mire When contain in the。外文翻译---氧化沟工艺在污水处理中的应用与发展-环境工程(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。