外文翻译---气动移载机与plc控制-plc设计(编辑修改稿)内容摘要:

d may facilitate realization. The robot sets an example the integration of machinery intelligence equipment. flows in the automated system in the manufacture and the thing to act the strong character. But the standard industry robot only is has certain degrees of freedom an intelligent electromechanical device. Isolation robot in the actual operating mode is not any application value. only then according to factor and so on work content, work piece form, quality, contour characteristic and size matches to the robot by the auxiliary machinery installment like hand fingernail which adapts, it only then can bee the practical production equipment. air operated not only is robot main drive type is quickmoving requesting machinist terminal execution quickmoving, the structure simple, the control maintenance convenient, the cost to be low, Moreover the flexible transformation quick. and has the versatile assembly and the transporting and so on ascends when puts, the transmission movement work, uses air operated, or air operated bines with other transmission control technologies further increases its movement precision and the flexibility relatively fixed. Moreover the movement is frequent, the duplicated strong center low power operating mode in the work space scope limited, working routine, and uses the air operated modular organization unit the bination to realize the machinist work, can manifest the air operated technical effective substitution manpower operation realization production process Taiwan physics and chemistry and the automated characteristic and the 外文翻译资料 7 superiority. Is can be fast to the air operated machinist39。 s basic request, accurately ascend to put requests them with transporting thing. To have the high accuracy, the rapid reaction, the certain bearing capacity, the enough working space and the nimble degree of freedom and in the free position all can characteristic and so on automatic positioning. Designs the air operated machinist39。 s principle is: Full analysis work object (work piece) the work specification, and draws up the most reasonable work working procedure and the craft. And satisfies the system function request and the environmental condition。 explicit: The work piece structure shape and the materials behavior, the pointing accuracy request. capture, time the transporting stress characteristic, the size and the quality parameter and so on, thus further determines to the machinist structure and the operating control request。 The as far as possible designation standard module, the simplification design manufacture process. Pay attention to both versatility and specialpurpose, and can realize the flexible transformation and the programming control. The air operated hand fingernail is the present machinist transports, the assembly class machinist in particular in captures in the technology to apply most universal way. it to be possible to realize bidirectional captures, voluntarily to the center, moreover the redundant precision high. Capture the strength to be constant. and may conveniently match meets each kind of jig. The air operated hand fingernail is direct connection between the machinist and of the work object, the careful analysis, chooses the good air operated hand fingernail to relate directly to machinist39。 s operating performance. In the actual movement, the hand fingernail supports on both sides the strength to be supposed to guarantee is bigger than all static and the dynamic strength sum total. The PLC procedure movement way is circulates the scanning way, but the non order carries out the way。 therefore any manipulator satisfies。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。