合同文字格式全文中英文对照(doc129)-合同协议(编辑修改稿)内容摘要:

r delay is not allowed. The age of the carrying vessel chartered by the Seller shall not exceed 15 years. In case her age exceeds 15 years, the extra average insurance premium thus incurred shall be borne by the Seller. Vessel over 20 years of age shall in no event be acceptable to the Buyer. For cargo lots over 1,000 M/T each, or any other lots less than 1,000 metric tons but identified by the Buyer, the Seller shall, at least 10 days prior to the date of shipment, inform the Buyer by telex or cable of the following information: the contract number, the name of modity, quantity, the name of the carrying vessel, the age, nationality, and particulars of the carrying vessel, the expected date of loading, the expected time of arrival at the port of destination, the name, telex and cable address of the carrier. For cargo lots over 1,000 M/T each, or any other lots less than 1,000 metric tons but identified by the Buyer, the Master of the carrying vessel shall notify the Buyer respectively 7 (seven) days and 24 (twentyfour) hours prior to the arrival of the vessel at the port of destination, by telex or cable about its ETA (expected time of arrival), contract number, the name of modity, and quantity. If goods are to be shipped per liner vessel under liner Bill of Lading, the carrying vessel must be classified as the highest ____________ or equivalent class as per the Institute Classification Clause and shall be so maintained throughout the duration of the relevant Bill of Lading. Nevertheless, the maximum age of the vessel shall not exceed 20 years at the date of loading. The seller shall bear the average insurance premium for liner vessel older than 20 years. Under no circum stances shall the Buyer accept vessel over 25 years of age. For break bulk cargoes, if goods are shipped in containers by the Seller without prior consent of the Buyer, a pensation of a certain 中国最大的管理资料库下载 amount to be agreed upon by both parties shall be payable to the Buyer by the Seller. The Seller shall maintain close contact with the carrying vessel and shall notify the Buyer by fastest means of munication about any and all accidents that may occur while the carrying vessel is on route. The Seller shall assume full responsibility and shall pensate the Buyer for all losses incurred for its failure to give timely advice or notification to the Buyer. 16 CIF Terms: Under CIF terms, besides Clause 15 Camp。 F Terms of this contract which shall be applied the Seller shall be responsible for covering the cargo with relevant insurance with irrespective percentage. 17 Advice of Shipment: Within 48 hours immediately after pletion of loading of goods on board the vessel the Seller shall advise the Buyer by cable or telex of the contract number, the name of goods, weight (/gross) or quantity loaded, invoice value, name of vessel, port of loading, sailing date and expected time of arrival (ETA) at the port of destination. Should the Buyer be unable to arrange insurance in time owing to the Seller39。 s failure to give the above mentioned advice of shipment by cable or telex, the Seller shall be held responsible for any and all damages and/or losses attributable to such failure. 18 Shipping Documents 中国最大的管理资料库下载 The Seller shall present the following documents to the paying bank for negotiation of payment: Full set of clean on board, freight prepaid for Camp。 F/CIF Terms or Freight to collect for FOB/FAS Terms, Ocean Bills of Lading, made out to order and blank endorsed, notifying ___________at the port of destination. Five copies of signed invoice, indicating contract number, L/C number, name of modity, full specifications, and shipping mark, signed and issued by the Beneficiary of Letter of Credit. Two copies of packing list and/or weight memo with indication of gross and weight of each package and/or measurements issued by beneficiary of Letter of Credit. Two copies each of the certificates of quality and quantity or weight issued by the manufacturer and/or a qualified independent surveyor at the loading port and must indicate full specifications of goods conforming to stipulations in Letter of Credit. One duplicate copy of the cable or telex advice of shipment as stipulated in Clause 17 of the Terms of Delivery. A letter attesting that extra copies of abovementioned documents have been dispatched according to the Contract. A letter attesting that the nationality of the carrying vessel has been approved by the Buyer. The relevant insurance policy covering, but not limited to at least 110% of the invoice value against all and war risks if the insurance is covered by the Buyer. Any original document(s) made by rephotographic system, automated or puterized system or carbon copies shall not be acceptable unless 中国最大的管理资料库下载 they are clearly marked as ORIGINAL. and certified with signatures in hand writing by authorised officers of the issuing pany or corporation. Through Bill of Lading, Stale Bill of Lading, Short Form Bill of Lading, shall not be acceptable. Third Party appointed by the Beneficiary as shipper shall not be acceptable unless such Third Party Bill of Lading is made out to the order of shipper and endorsed to the Beneficiary and blank endorsed by the Beneficiary. Documents issued earlier than the opening date of Letter of Credit shall not be acceptable. In the case of Camp。 F/C。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。