外文翻译---工业工程概述(编辑修改稿)内容摘要:

facturing systems planning, design, construction and operation of the innovation theory and method, which uses system ponent / module configuration (layout) of the variability can be updated with the realization of the manufacturing system variability. It will of the products, manufacturing systems and the installation of hardware and software design and manufacturing have a profound impact. ② No loss of processing (Waste2free Processing). The future of the manufacturing process is energy consumption and minimize the consumption of resources. ③ New course materials (New Materials Process). It is built on the innovations of raw materials and spare parts manufacturing methods and processes on the basis of. ④ Manufacturing biotechnology (Biotechnology for Manufacturing). It is the use of technology to automate the processing and assembling a new generation of manufacturing technology. ⑤ Enterprise modeling and simulation (Enterprise Modeling and Simulation). Such technology to solve enterprise system transformation, business processes and manufacturing operations of all the modeling, simulation and systems integration and other issues effectively integrated. ⑥ IT (Information Technology). It is the correct and efficient decisionmaking at all levels to provide key information in all directions and the rapid conversion of intelligence information and knowledge technologies. ⑦ Product and process design (Product and Process Design Methods). It requires innovative systems, products and processes/process design theory, methods and tools, is the next generation of puteraided design principle, methods and tools. ⑧ Enhanced machines the interface (Enhanced Machine Human Interfaces). It is machines and people to solve the problem of a new generation of humanputer interface engineering technology, focused on solving the physical interface design and enhance the learning ability of the staff problems. ⑨ Staff education and training (Workforce Education and Training). It requires the construction of a rapid Lenovo knowledge of education and training and development of direct munication between the different language translation machine, and different cultures, languages staff cooperation. ⑩ Intelligence cooperation system software (Software for Intelligent Collaboration Systems). Its purpose is to a different language and cultural background of the expert intelligence cooperation through the integration of software as one. It includes group munication protocol。 an agreement creating private works, distributed business process control methods and standards and sharing of knowledge, such as software development is the use of the interactive and dynamic model of cooperation between all the smart software and interface software form of virtual cooperation Space. 2) Development and use of information technology, information systems and knowledge management systems Information was understood to be processed after obtaining one can accept and understand the meaning of intelligence has identified those raw materials. Information technology is puter technology, microelectronics detection sensor technology and munication technology as the backbone of the technology group. Information System is to provide a flow of information processing and accurate data and information work, the core functions of information processing and storage preservation. Industrial engineers should actively conduct information systems and software tools of research and development, particularly SCM, CRM, XRP (expansion of the resource planning) and electronic merce (e2C), emerce (e2B) and Knowledge Management System for the project, Development and utilization. Industrial engineering methodology to play the advantage, In China the use of information technology to transform and upgrade traditional industries, development of learning organization, organizationwide potential to play and adapt to rapidly changing market petition in the display industry engineers talent. 3) Development and the establishment of management systems engineering 1990 W. Skinner explicitly pointed out: Failure of the traditional management. Modern enterprises urgently need a new management theory, methods and tools, nearly 7 to 8 years of study and set off to the business munity theory of constraints (TOC, Theory of Constraints) craze. The socalled constraint management is E1M1Goldratt development of a management philosophy, which is made up of three separate but related to the performance of determination, logical thinking process and the logistics of the project to protect (APICS, 2020). It is not the optimal production technologies OPT, from the following areas fundamental to improve the management theories, methods and tools. ① The purpose of business is no longer just for the boss to make money but pletely satisfied with the beneficiaries (TSS, total stakeholder satisfaction). To achieve TSS, corporate goal is to make money, like now with the future to ine, return on investment and cash flow three indicators measure corporate performance, with production and sales, inventory and operating costs of the operation of enterprises measure, and sales Maximize the quantity, inventory and operating costs to minimize as the goal of optimizing the operation of enterprises criterion. ② Constraints is bound to stop (the enterprise) system to achieve its goal of a higher level of performance factors (APICS, 2020). Constraintbased fivestep method, 99 / 1 rules and DBR (drums / buffer / letters cable) Act, and is looking for ways to resolve system constraints, can effectively use them to find bottlenecks and enhance enterprise performance level. ③ Constraintbased management in accordance with the principles of TOC management organization and resources of the practice (APICS, 2020). It uses DB。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。