外文翻译---对用高温高压连续流微反应合成磷化铟纳米晶体的研究(编辑修改稿)内容摘要:

tical conditions tunable from liquid to gas like providing high diffusion rates, improved mixing,[6] and the ability to solubilize various pounds inaccessible by solvents employed in traditional nanocrystal syntheses.[2b,c, 3, 7] The use of a supercritical solvent in a microfluidic reactor results in narrower residence time distributions, producing homogeneous reaction conditions ideal for nanocrystal synthesis.[8] Microfluidic systems allow precise control over reaction conditions and reproducibility[9] as a result of rigorous control of heat and mass transfer.[10] In addition, themicrofluidic system can be utilized for fast screening of reaction parameters with in situ reaction monitoring.[11] Figure 1 illustrates our truly continuous threestage siliconbased microfluidic system consisting of mixing, aging, and sequential injection stages operating at a pressure of 65 bar, 3 without incorporating any manual batch manipulation between synthesis steps.[2h] We have separated each stage in order to independently probe mixing and aging processes. The first two stages of the reactor were utilized for the systematic study of InP nanocrystal formation (Figure 1 a,b). The mixing reactor was maintained at a uniform temperature。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。