外文翻译---室内装饰简述(编辑修改稿)内容摘要:

iples 1 Interior design to be used to meet the functional requirements Interior design is to create a good environment for the purpose of the indoor space, so that the rationalization of the indoor environment, fort and scientific。 people have to consider the activities of the law deal with the relationship between space, space size, the proportion of space。 rational distribution of furniture and furnishings, indoor proper solution Ventilation, lighting and lighting, interior color attention to the overall effect. 2 Interior design to meet the functional requirements of the spirit The interior design is to affect the spirit of the people39。 s feelings, and even affect the people39。 s will and action, so to study people39。 s understanding of the characteristics and laws。 study of human emotions and the will。 study of the interaction between people and the environment. Designers to use a variety of theories and methods to the impact of human emotion to achieve the distillation of the effectiveness of the design. If the indoor environment to highlight the mood and show some kind of idea, then it will have a strong artistic appeal, the better play in the spirit of its functions. 3 Interior design to meet the demands of modern technology Construction of the space for innovation and structural design innovations are closely linked, the two should be harmonized to achieve, give full consideration to shape the structure of the image of China and the United States, the arts and technology together. This requires the interior designer must have the necessary structure of the types of knowledge, familiar with and master the structure of the system performance characteristics. Modern interior design, it is outside the scope of modern science and technology, interior design to better meet the requirements of the spirit of the function, it is necessary to maximize the use of modern science and technology, the latest results. 4 Interior design to take into account local characteristics and requirements of national style As the region39。 s people, geography and climate differences between various ethnic groups and lifestyles of different cultural traditions, in the architectural style there are indeed very different. China is a multiethnic country, in all areas of national characteristics, national character, customs and cultural factors such as differences so that the interior design is different. Design have different styles and characteristics. To reflect the ethnic and regional characteristics in order to arouse people39。 s sense of national pride and selfconfidence 三 Interior design elements: Interior space is on the ground, wall, top of the tube together by qualify in order to determine the indoor space the size and shape. For the purpose of interior decoration is to create the application, the appearance of the indoor environment, indoor space on the ground and the walls are set off and furniture, furnishings background, and the differences so that the top surface of the indoor space more changes. 1 surfacedecorated ground floor, decorated Face in people39。 s view of the scope of it is very important, on the ground floor, and people who have frequent contacts, and the last lineofsight, and。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。