外文翻译---基于单片机的步进电机电路控制设计-单片机(编辑修改稿)内容摘要:
cation, it uses strong internal pullupswhen emitting 1s. During accesses to external data memory that use 8bit addresses, Port 2 emits the contents of the P2 Special Function 2 also receives the highorder address bits and some control signals during Flash programming and verification. Port 3 Port 3 is an 8bit bidirectional I/O port with internal Port 3 output buffers can sink/source four TTL 1s are written to Port 3 pins they are pulled high by the internal pullups and can be used as inputs. As inputs,Port 3 pins that are externally being pulled low will source current (IIL) because of the 3 also serves the functions of various special features of the AT89C51 as listed below: Port 3 also receives some control signals for Flash programming and verification. RST Reset input. A high on this pin for two machine cycles while the oscillator is running 14 resets the device. ALE/PROG Address Latch Enable output pulse for latching the low byte of the address during accesses to external memory. This pin is also the program pulse input (PROG) during Flash normal operation ALE is emitted at a constant rate of 1/6 the oscillator frequency, and may be used for external timing or clocking purposes. Note, however, that one ALE pulse is skipped during each access to external Data Memory. If desired, ALE operation can be disabled by setting bit 0 of SFR location 8EH. With the bit set, ALE is active only during a MOVX or MOVC instruction. Otherwise, the pin is weakly pulled high. Setting the ALEdisable bit has no effect if the microcontroller is in external execution mode. PSEN Program Store Enable is the read strobe to external program the AT89C51 is executing code from external program memory, PSEN is activated twice each machine cycle, except that two PSEN activations are skipped during each access to external data memory. EA/VPP External Access Enable. EA must be strapped to GND in order to enable the device to fetch code from external program memory locations starting at 0000H up to FFFFH. Note, however, that if lock bit 1 is programmed, EA will be internally latched on should be strapped to VCC for internal program pin also receives the 12volt programming enable voltage(VPP) during Flash programming, for parts that require12volt VPP. XTAL1 Input to the inverting oscillator amplifier and input to the internal clock operating circuit. XTAL2 Output from the inverting oscillator amplifier. Oscillator Characteristics 15 XTAL1 and XTAL2 are the input and output, respectively,of an inverting amplifier which can be configured for use as an onchip oscillator, as shown in Figure a quartz crystal or ceramic resonator may be used. To drive the device from an external clock source, XTAL2 should be left unconnected while XTAL1 is driven as shown in Figure are no requirements on the duty cycle of the external clock signal, since the input to the internal clocking circuitry is through a dividebytwo flipflop, but minimum and maximum voltage high and low time specifications must be observed. Figure 1. Oscillator Connections Figure 2. External Clock Drive Configuration Idle Mode In idle mode, the CPU puts itself to sleep while all the onchip peripherals remain active. The mode is invoked by software. The content of the onchip RAM and all the special functions registers remain unchanged during this mode. The idle mode can be terminated by any enabled interrupt or by a hardware should be noted that when idle is terminated by a hard ware reset, the device normally resumes program execution,from where it left off, up to two machine cycles before the internal reset algorithm takes control. Onchip hardware inhibits access to internal RAM in this event, but access to the port pins is not inhibited. To eliminate the possibility of an unexpected write to a port pin when Idle is terminated by reset, the instruction following the one that invokes Idle should not be one that writes to a port pin or to external memory. Powerdown Mode 16 In the powerdown mode, the oscillator is stopped, and the instruction that invokes powerdown is the last instruction executed. The onchip RAM and Special Function Registers retain their values until the powerdown mode is terminated. The only exit from powerdown is a hardware reset. Reset redefines the SFRs but does not change the onchip RAM. The reset should not be activated before VCC is restored to its normal operating level and must be held active long enough to allow the oscillator to restart and stabilize. Program Memory Lock Bits On the chip are three lock bits which can be left unprogrammed (U) or can be programmed (P) to obtain the additional features listed in the table below. When lock bit 1 is programmed, the logic level at the EA pin is sampled and latched during reset. If the device is powered up without a reset, the latch initializes to a random value, and holds that value until reset is activated. It is necessary that the latched value of EA be in agreement with the current logic level at that pin in order for the device to function properly. Introduction Stepper motors are electromagic incrementalmotion devices which convert digital pulse inputs to analog angle outputs. Their inherent stepping ability allows for accurate position control without feedback. That is, they can track any step position in openloop mode, c。外文翻译---基于单片机的步进电机电路控制设计-单片机(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。