外文翻译---基于单片机的多功能温度检测系统的设计-单片机(编辑修改稿)内容摘要:

ventional programming. In a single chip, have clever 8 bits CPU and programmable Flash in the system, for many embedded control AT89S52 application system provides a highly flexible, efficient solutions [5]. AT89S52 has the following functions: the standard 256 bytes, 8k byte Flash RAM, 32 I/O port, the watchdog timer, 2 data, three pointer 16 timer/counter, a 6 vector level 2 interrupt structure, fullduplex serial, timely clock circuit within crystals. In addition, 0Hz AT89S52 can drop to the static logic operation, support two software can choose power saving mode. Idle mode, the CPU to stop working, and allows the RAM, timer/counters, serial, continue to work. Protection mode, RAM by MCU, oscillator is frozen, all the work to stop until the next interruption or hardware reset. ( 2) The sensor DS18B20 5 In the traditional analog signal distance temperature measuring system, need good solve lead error pensation, multipoint measurement error and amplifying circuit switching technologies such as zero drift error problem, can achieve high measuring accuracy. Another general monitoring site of the electromagic environment is very bad, all kinds of jamming signal is stronger, the simulated temperature signal interference and vulnerable to produce measurement error and measuring precision [5]. Therefore, in temperature measuring system, the strong antijamming capability of the new digital temperature sensor is the most effective to solve these problems, pared with other temperature sensor DSl820 has the following features: (1) the unique singleline interface way. DSl820 in connection with the microprocessor only need one interface to implement line DSl820 microprocessors and twoway munication. (2) more function simplifies distributed temperature detection application. (3) DSl820 in use without any peripheral devices. (4) power, voltage range data available from V to V. (5) can measure temperature range from 55 degrees c + + to 125, incremental value 0. 5 176。 c, Fahrenheit temperature range from 67 to + 257, incremental value . (6) support multipoint work function. Multiple DS1820 can pick on the same bus and, more temperature measurement. (7) 9 temperature resolution. Measuring results in nine serial transmission way the digital quantity. (8) user can set temperature alarm threshold. (9) have super temperature search function. ① .DSl8B20 principle of work The internal structure of DS18B20 DSl8B20 temperature measurement principle diagram shown in figure . Low temperature coefficient graph oscillation frequency vibration product temperature is used to produ。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。