外文翻译---发电厂电气系统综合自动化-电气类(编辑修改稿)内容摘要:

rough this connection mode needs manycables, and the cost is high. Besides, the information It is electric operation management or achieve deep application of Since DCS is the most important system in power 3 Feasibility Analysis of Electrical System Integrated Automation The improvement of electrical system automation is based on integrated automation and field bus or industrial Ether technology. Microputer9based protection and automation devices are widely used in power plant electrical system. The measure, logic judge, action, record and man9 machine interface function can be done by software. Moreover, all these devices have munication interface, they can exchange information with master system or with each other through field bus. Fieldbus technology has been widely used in industry and electric power field , and it has been paid more and more attention. The technology in munication rate , munication distance and anti jamming capability has been improved. Many sorts of standards have been formed, such as Profibus advocated by Siemens, FF by ABB, CAN originated from automobile industry and Lon works brought forward by Echelon pany. They are all influential fieldbus technology and applied in industry automation area [4 ]. Recently, industrial Ether work bees new hotspot. The application of microputerbased devices of electrical system, fieldbus or industrial Ether technology and munication capability provided by DCS system bring powerful support for the integrated automation of power plant electrical system. 4 Real inaction of Integrated Automation in Electrical System Electrical system integrated automation is to connect foregoing many protective relay and automation devices by fieldbus and then connect them to DCS system and (possible) electrical workstation through munication devices. The electrical workstation imple。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。