外文翻译---冷冲模具使用寿命的影响-模具设计(编辑修改稿)内容摘要:
chemical position, structure, hardness and prehensive reflection of metallurgical quality. Among them, the material properties and heat treatment affect the quality of the most obvious. Mold material properties on the impact of die life is great. If the same workpiece, using a different mold material of the bending test, the test results: The 9Mn2V material, the life of 5 million。 with Crl2MoV nitriding, the life of up to 40 million. Therefore, the choice of materials, the batch size should be based on workpiece, rational use of mold materials. The hardness of the die parts to Die Life a great impact. But not the higher hardness, longer die life. This is because the hardness and strength, toughness and abrasion resistance are closely related. Some die demands of high hardness, long life. Such as the use of T10 steel dies, hardness 54 ~ 58HRC, only washed thousands of times a burr on the workpiece great. If the hardness to 60 ~ 64HRC, the grinding life of up to 2 to 3 million. However, if continue to improve hardness, fracture occurs earlier. Some die hardness should not be too high, as the die manufacturing using Crl2MoV 58 ~ 62HRC hardness, the general life of 23 million, invalid form of chipping and cracking, and if the hardness down to 54 ~ 58HRC, life expectancy increased to 5 ~ 60 000, but decreased to 50 ~ 53HRC hardness appears easy to blunt the die edge phenomenon. Thus, mold hardness must be based on material properties and failure modes may be. Should enable the hardness, strength, toughness and wear resistance, resistance to fatigue strength needed to achieve a particular stamping process the best match. 3. The surface of the mold heat treatment to strengthen the quality and impact on life Mold heat treatment the nature and quality of life of the mold a great impact. Practice shows that the die parts of the quenching distortion and cracking, early fracture during use, while the metallurgical and materials quality, forging quality, mold structure and process related, but related more to die of heat treatment. According to statistical analysis of failure causes of mold, heat treatment failure due to improper accounting for more than 50%. Practice shows that the mold material must be acpanied by high heat treatment process properly, can really play a material39。 s potential. Parts surface hardening mold work purpose is to obtain the effect of external hard tough inside, so be hardness, wear resistance, toughness, good resistance to fatigue with. Many ways to die surface hardening, surface treatment technology of new technologies developed rapidly. In addition to Nitrocarburizing and ion nitride, boride, 7 seepage niobium, vanadium permeability, hard chrome plated and spark strengthening, the chemical vapor deposition (CVD) and physical vapor deposition (PVD) has been gradually adopted. By CVD and PVD treatment, the mold surface covered with superhard material, such as TiC, TiN, etc.. High hardness, wear resistance, corrosion resistance, adhesion is very good, can improve the die life several times to several times. 4. Manufacturing precision of the die parts of die life Precision die manufacturing and life in it in particular, mold surface roughness on the mold a great impact. If using Crl2MoV steel blanking die, if the surface roughness value R = m, its life span is about 30,000. Such as polished by the precision, surface roughness value R = m, life can be increased to 45 million. Therefore, the working parts of the mold surface, the general must go through grinding, grinding, polishing and other finishing and fine processing. 5. Other aspects of the impact of die life (1) Press the accuracy is not high, but also easy to make die damage. (2) die in the press or not installed properly and the operator39。 s technical level, on the tool life is also greatly affected. (3) dies in the custody and maintenance of good and bad, and the use of lubricant condition also affects mold life. Cold die clearances between control and adjusting method Cold stamping mould convex, concave die size and distribution of the clearance degree directly affect the quality of the blanking pieces and the length of the service life of the die. In guarantee blanking pieces space is mould manufacturing assembly very important link, and assembly quality will directly influence the convex, concave。外文翻译---冷冲模具使用寿命的影响-模具设计(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。