外文翻译---关于美国跨国公司的成本管理(编辑修改稿)内容摘要:

departments is minimized. The contents of the report (1) Plant Code: means all subsidiaries of the multinational corporations in accordance with the coding region. English is generally short. For example, enterprises in the United States: CherawCH, the European factory: Mosley StoneMS and so on. (2) Item number: is the number of all cost reduction programs, the first few letters is the industry shorthand for the future as the three figures to 001,002, for example: TER99001, TSB99001, TNB99001 and so on. (3) Subitem number: refers to the same subitems under the item number, especially those different items in the ine statement, usually A, B, C to represent. (4) Conservation means: refers to the savings obtained from the following ways: purchasing (and negotiation suppliers or new suppliers, reducing conditions, to achieve the purpose)。 economic (market price changes, such as raw materials, packaging materials, timber)。 Outsourcing (past their high production costs, cost 2 savings are purchased)。 productivity (improvement, loss reduction, methods and improvement of productivity)。 design (product appearance, process improvement)。 rationalization (plant rationalization of the proposed savings)。 other. (5) Production line coding. The project refers to products which reduce the production line, production line of code can be used more precisely to reduce the project description. (6) Project Manager: means the person in charge of this project. (7) Start time: After the implementation of this project means the actual amount of savings the month. If the amount of savings did not materialize, this time of the month the amount is expected to achieve savings. (8) Actual savings in 1998 amount: This amount is lower in cost savings reported in the year 1998 amount. (9) The amount of savings in 1999: 1999 refers to the amount of actual savi。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。