外文翻译---gps在轮胎式集装箱起重机上的应用(编辑修改稿)内容摘要:

enomena。 then the performance of the crane will decrease. With position monitoring on both seaside and land side Synchronous control could be used to remove this problem; 7. AGV navigation traveling of AGV could be remotely controlled with the help from GPS data; 8. Position monitoring for container truck the GPS product could also be applied on container trucks for position monitoring. Application of GPS on container operation management The traditional mode of container operation in many ports is: firstly, in the operation department, information on the containers to be operated would be stored in a main puter; Secondly, the operation message for a certain container with container ID and its position will be sent via radio to an RTG Thirdly the RTG operator will drive the RTG t finish the operation; Finally, the pletion of the operation will be acknowledged by the operator in that sequence, some potential problem may occur: positions of the RTGS are not clearly indicated and RTG having optimal path can’t be selected; the cost then increases; 2. there is no monitoring of the container, then the container may be misplaced: 3. manual interference for acknowledgement is required. However the whole operation could be made in a closed loop by puters without any potential mistake involved by equipping RTGs with GPS. Also the efficiency could be raised greatly See the charts for details. Technical data of the GPS from ZPMC 1. System configuration 1). The whole project of RTGs will be equipped with one GPS base station it consists of a dual—frequency GPS receiver and a modulating radio transmitter. The function of the base station is to send correction data of GPS position to each crane station. 2). Each crane will be equipped with a GPS rover station which consists of two GPS receivers and a mon radio receiver. This rover station will check the current position of the RTG with a precision at centimeter level. The position signal will be sent to the main PC to be dealt with for functions of container position and auto steering control etc. The whole GPS system is pact, simple a。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。