外文翻译----设计基础的基本原理(编辑修改稿)内容摘要:
tion, adaptation, planning and creativity. The assignments in this Basic Design course are unique in that each project is built one on each other. This approach allows people to gain new insights by looking at one’s previous work. In addition, this course can direct everyone’s individuality, allowing one’s work to reflect their own personality and cultural background. All aspects of the results obtained will be beneficial. Although this Basic Design course is for teachers and students of design, it can be applied to many other fields as well. This book can be read in any order. However, to take full advantage, it is remended that all assignments are taken in sequence. It is crucial to use only basic drafting tools to pete each assignment rather than high tech equipment. The assignments in this book are highly adaptable to any future studies by its reader. They are not simply focused on one area of study such as design or art or architecture but are designed to teach principles useful for everyone. This book is divided into two main sections: twentysix “issues” and twentyeight assignments, the latter subdivided into three parts. 1) The Introduction includes the philosophy of basic design and twentysix issues. Each issue reveals the reasons for writing this book and the philosophy of teaching design. Some issues will be illustrated with the author’s own design。外文翻译----设计基础的基本原理(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。