外文翻译----模具的发展趋势-模具设计(编辑修改稿)内容摘要:
ture . Australian pany Moldflow realistic threedimensional flow simulation software MoldflowAdvisers been widely praised by users and applications. China Huazhong University of Science have developed similar software and Zhengzhou University, 6 Zmold software. For manufacturing, knowledgebased intelligent software function is a measure of die important sign of advanced and practical one. Such as injection molding experts Cimatron39。 s software can automatically generate parting direction based parting line and parting surface, generate products corresponding to the core and cavity, implementation of all relevant parts mold, and for automatically generated BOM Form NC drilling process, and can intelligently process parameter setting, calibration and other processing results. (3) mold software applications, working trend With the mold in the enterprise petition, cooperation, production and management, globalization, internationalization, and the rapid development of puter hardware and software technology, the Inter has made in the mold industry, virtual design, agile manufacturing technology both necessary and possible. The United States in its 21st Century Manufacturing Enterprise Strategy that the auto industry by 2020 to achieve agile manufacturing / virtual engineering solutions to automotive dvelopment cycle shortened from 40 months to 4 months. 2 mold testing, processinge equipment to the precise, efficient, and multidirection (1) mold testing equipment more sophisticated, efficient Sophisticated, plex, largescale mold development, testing equipment have bee increasingly demanding. Precision Mould precision now reached 2 ~ 3μm, more domestic manufacturers have to use Italy, the United States, Japan and other countries in the highprecision coordinate measuring machine, and with digital scanning. Such as Dongfeng Motor Mould Factory not only has the capacity 3250mm 3250mm Italian coordinate measuring machine, also has a digital photography optical scanner, the first in the domestic use of digital photography, optical scanning as a means of spatial threedimensional access to information, enabling the establishment from the measurement of physical → model output of engineering drawings → → the whole process of mold making, reverse engineering a successful technology development and applications. This equipment include: 7 secondgeneration British Renishaw highspeed scanners (CYCLON SERIES2) can be realized and contact laser probe plementary probe, laser scanner accuracy of , scanning probe contact accuracy of mm. Another German pany GOM ATOS portable scanners, Japan Roland39。 s PIX30, PIX4 desktop scanner and the United Kingdom Taylor Hopson39。 s TALYSCAN150 multisensor, respectively Threedimensional scanner with high speed, lowcost and functional posite and。外文翻译----模具的发展趋势-模具设计(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。