外文翻译----浅谈建筑环境与暖通空调能耗-暖通(编辑修改稿)内容摘要:
protect structure to transmit heat hot lose about 71% of have the all hot loss。 (among them outside the wall is 28%, the window is 28%, the house noodles is 9%, the veranda door the lower part is 1%, the outside door is 1%, ground 4%)The air that passes the doors and windows blind side permeate hot lose to have 29% showed from this an improvement to round hot work function of protect the structure an air condition for the warm. The economy energy has important meaning. Influence constructed the programming design an air condition economy energy to the warm. Program a design construct the important aspect of[with] the economy energy design, programing economy energy a design should choose an address from the construction,cent area,the building and road set up an alignment,building directions toward,building type of figure,building be apart from,winter monsoon predominance direction,the sun radiation,building the exterior space environment constitute etc. carry on a research. With excellent turn the tiny weather environment of the building。 Be advantageous to economy energy, full value and make use of the solar energy,winter predominance direction of wind,geography and geography, make use of natural design of economize on energy the programming is the beneficial and disadvantageous influence of decision factor,the radiation factor,the atmosphericcirculation factor and the geography factor that analyzes to make good, passing a building of the programming layout carries on to the abovementioned factor full make use of,reformation, bee to live a condition and be advantageous to the tiny weather environment of[with] economy energy flank of the building of green turn to have already defended breeze and separate a voice,dust palliative and beautify environment not only of function, and for building the economy energy also has an important function. Because the tree can absorb humidity from the root first, leading leaf39。 s noodles to evaporate together, lowering the air temperature thus, secondly the tree is good hide the sun function, make thus the building be subjected to directly of the sun radiation and get from the ground of the radiation heat reduce, two is the function that the tree has leading breeze and blocks addition, the ground will reflect the sun radiation not only, and its radiation bee again after go up new of hot radiation grow grass and plant trees as far as possible, avoid the ground soil bare, and reduce the otiose and big area concrete ground ping for reduce the air condition burden, the purpose that attains e。外文翻译----浅谈建筑环境与暖通空调能耗-暖通(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。