钢材配件对译doc143-经营管理(编辑修改稿)内容摘要:

electric steel making process 电炉炼钢操作法 electric welded steel pipe 电焊钢管 electric(al) steel 电工钢 electricresistancewelded steel pipe 电阻焊钢管 electrical steel 电炉钢 electrical steel sheet 电工硅钢片 electrogalvanised steelclad fire door 电镀钢包防火门 大量的管理资料下载 electrogalvanized steel wire 电镀锌钢丝 electroless nickel plated steel 化学镀镍钢。 无电镀镍钢 electrosmelting of steel 电炉炼钢 embedded steel 埋置钢筋 En steel (英国标准 ) 工程用低碳钢 enamelled pressed steel 搪瓷钢板 enamelling sheet steel 钢板搪瓷 endbearing steel Hpile 端部承载的工字钢桩 equal angle steel 等边角钢 dull steel sheet 不光亮的钢板 effervescing steel 沸腾钢 eutectic steel 共晶钢 eutectoid steel 共析钢 expanded steel diamond mesh 菱形钢板网 expanded steel packing element 钢板网蜂窝填料 大量的管理资料下载 extension steel 接杆钎子 extra deepdrawing steel 极深冲钢。 优质深冲钢 extra fine steel 超细钢 extra hard steel 特硬钢。 超硬钢 extra soft steel 特软钢 extra special improved plough steel wire 超级制绳钢丝 extra strong steel pipe 特强钢管 extra thick steel wire 特粗钢丝 extra thin steel wire 特细钢丝 extradeep drawing steel 超深冲钢 extrahigh tensile steel 特高强度钢 extrahightensile steel 超高强度钢 extralow carbon steel 极低碳素钢 extralowcarbon stain less steel 超低碳不锈钢 大量的管理资料下载 effervescenced steel 沸腾钢 fabricated steel 结构钢 fabricated steel body 装配式钢体 fast moltensteel temperature gauge 钢液快速测温仪 equilateral angle steel 等边角钢 extreme low carbon steel 超低碳钢 ferritic stainless steel 铁素体不锈钢 ferritic steel vessel 铁素体钢容器 ferroaluminiummanganese steel 铁铝锰钢 ferrovanadium steel 钒钢 ferrite steel 铁素体钢 ferritic steel 铁素体钢 erection of steel work 钢架装置 figured steel 异形钢 fiery steel 过烧钢 大量的管理资料下载 finished steel 成品钢。 精制钢 finishing steel 最后的钻 杆 fire resistance steel door 钢质防火门 fireresistant coating for steel structure 钢结构防火涂料 fine steel 合金钢 fixation with steel pin 钢丝针固定 fixation with steel wire 钢丝固定 acid Bessemer steel 酸性转炉钢 flange angle steel 凸缘角钢 flange cast steel sluice valve 法兰铸钢闸阀 flange steel 凸缘钢 flat and round steelchain 平圆式钢链 flat bulb steel 扁球钢 flat mild steel bar 扁型软钢 大量的管理资料下载 flat rolled steel bar 压延钢条 flat spring steel 扁弹簧钢。 扁簧钢 flat steel 扁钢 flat steel bar 扁钢条 fireresisting steel sliding door 防火钢推拉门 file steel 锉刀钢 flat strip steel 平钢带 flat threaded steel 扁螺纹钢 flatbulb steel 球扁钢 flatrolled steel 扁钢 flex steel tape 钢卷尺 flexible drill steel 挠性钢钎 flexible flat drill steel 挠性扁钢钎 flexible ribbon steel 挠性带状钢钎 flexible stainlesssteel bellows 挠性不锈钢密封盒 大量的管理资料下载 flexible steel 挠 性钢钎 flexible steel in flat section 挠性扁钢钎 fluidpressed steel 液体压缩钢 folding steel chair 钢折椅 fixed steel window shutter 固定钢百叶窗 fed steel mag 锻造钢磁铁 fed steel rolls for hot rolling 锻钢热轧辊 fing quality steel 锻造用钢胚 fing steel 锻钢 fing steel valve 锻钢阀 formed steel base 型钢底座 fountain pen with stainless steel cap 不锈钢套钢笔 fountain pen with stainless steel nib 不锈钢钢笔 fourwinged steel bit 十字形钢钻头 大量的管理资料下载 framework of steel reinforcement 钢筋骨架 free cutting steel 高速切削钢。 自由切削钢 free cutting steel wire 易切削钢丝 free machining steel 高速切削钢 freecutting steel 易切削钢 freemachining steel 易切削钢 full killed steel 全镇静钢。 完全镇静钢。 镇静钢 full stainless steel watch 全钢表 fullhardened steel 全淬硬钢 fully hardening steel 全硬淬透钢 fully killed steel 全脱氧钢 fullydeoxidized steel 全脱氧钢 furniture of steel 钢家具 furniture of steel and wood 钢木家具 ga(u)ge steel 量具用钢 大量的管理资料下载 galvanized and welded steel pipe 镀锌焊缝钢管 galvanized corrugated steel 镀锌瓦楞薄钢板。 镀锌瓦楞钢板 galvanized mild steel animal chain 镀锌动物链条 galvanized mild steel countersunk head wood screw 镀锌沉头木螺丝 galvanized mild steel drive screw 镀锌螺丝钉 galvanized mild steel hexagonal bolt and nut 镀锌六角螺栓螺帽 galvanized mild steel hexagonal wire ting 镀锌六角铁丝网 galvanized mild steel link chain 镀锌铁链条 galvanized mild steel roofing bolt and nut 镀锌 瓦楞螺栓螺帽 galvanized mild steel roofing screw 镀锌瓦楞螺丝 galvanized mild steel round head machine screw 镀锌圆头机器螺丝 galvanized mild steel round head wood screw 镀锌圆头木螺丝 galvanized mild steel square nut 镀锌四方螺丝帽 galvanized round stitching steel wire 镀锌订书圆钢丝 大量的管理资料下载 galvanized steel 镀锌钢。 镀锌铁皮 galvanized steel corrugated sheet 镀锌波纹钢板 galvanized steel pipe 镀锌钢管 galvanized steel plain sheet 镀锌钢板。 镀锌平钢板 galvanized steel reinforcing mesh 镀锌钢筋网 galvanized steel self tapping screw 镀锌自攻螺线 galvanized steel sheet 镀锌钢板。 镀锌钢皮 galvanized steel strip 镀锌钢带 galvanized steel tube 镀锌钢管 galvanized steel wash boiler 镀锌钢洗衣煮锅 galvanized steel wire 镀锌钢丝 galvanized steel wire ting 镀锌钢丝网 galvanized steel wire rope 镀锌钢丝绳 galvanized steel wire rope clip 镀锌钢丝绳卡头 galvanized steel wire strand 镀锌钢绞绳 大量的管理资料下载 gas steel pipe 煤气钢管 Geiger steel analyzer 盖格 X 射线钢分析仪 general structural steel 普通结构钢 geology steel tube 地质钢管 girder steel 钢梁 glass lined steel (耐化学侵蚀的钢件 ) 搪玻璃钢件 glass lined steel pipe 衬玻璃钢管 glass steel tile 玻璃钢瓦 glass steel tube 玻璃钢管 glasshard steel 特硬钢 glasslined steel 玻璃衬里钢 glasssteel reflector 玻璃钢反射器 glassed steel 搪玻璃。 搪瓷钢 GLXW steel 高强度半镇静钢 大量的管理资料下载 grade of steel 钢号 grainoriented electrical steel 取向性硅钢片 grainoriented steel 晶粒取向钢 graphitic steel 石墨钢。 石墨体钢 graphitizable steel 石墨 化钢 grip between concrete and steel 钢筋混凝土握裹力 groove steel 槽钢 grooved spring steel 带槽弹簧钢 ground steel wire 磨光钢丝 gun steel 炮钢 gu。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。